(Thursday, January 16 at 08:45)
Line 7: Line 7:
 
#* Major bleed through, presumably from Hall A 1-pass beam [https://logbooks.jlab.org/entry/3764868 3764868]
 
#* Major bleed through, presumably from Hall A 1-pass beam [https://logbooks.jlab.org/entry/3764868 3764868]
 
# Tasks for today
 
# Tasks for today
#* After spin dance (3 pm in accelerator plan): L1 triggers studies (Sasha, Beni, Justin)
+
#* After spin dance (11 am -3 pm in accelerator plan): L1 triggers studies (Sasha, Beni, Justin)
 
#* Followed by cDAQ test (Sergey)
 
#* Followed by cDAQ test (Sergey)
 
#* Production data otherwise
 
#* Production data otherwise

Revision as of 11:06, 16 January 2020

Maintained primarily by RC for this week (Jon Z.). Other additions welcome.

Thursday, January 16 at 08:45

  1. Last 24 hours
    • Trippy beam yesterday and overnight. Some production data was collected.
    • L1 triggers studies have been postponed to today.
  2. Issues
    • Major bleed through, presumably from Hall A 1-pass beam 3764868
  3. Tasks for today
    • After spin dance (11 am -3 pm in accelerator plan): L1 triggers studies (Sasha, Beni, Justin)
    • Followed by cDAQ test (Sergey)
    • Production data otherwise
  4. Plan for later
    • Tagger accidental study (Richard). Tomorrow early a.m.? Will contact RadCon for final ok.

Misc. Notes

  1. MCC would like to perform a spin dance study for other halls Friday morning. This means four hours of beam studies time, during which hall D may or may not receive beam.