(Tuesday, January 21 at 08:45)
Line 43: Line 43:
 
# Tasks for today
 
# Tasks for today
 
#* Downtime for several hours.
 
#* Downtime for several hours.
#* Controlled access: solenoid investigations, FCAL base replacements.
+
#* Controlled access: solenoid investigations, FCAL base replacements. Any others?
 
# Plan for later
 
# Plan for later
 
#* Production, when we can!
 
#* Production, when we can!

Revision as of 02:12, 21 January 2020

Thursday, January 16 at 08:45

  1. Last 24 hours
    • Trippy beam yesterday and overnight. Issues in two cryomodules.
    • Some production data was collected.
    • L1 triggers studies have been postponed to today.
  2. Issues
    • Major bleed through, presumably from Hall A 1-pass beam 3764868
  3. Tasks for today
    • After spin dance (11 am -3 pm in accelerator plan): L1 triggers studies (Sasha, Beni, Justin)
    • Followed by cDAQ test (Sergey)
    • Production data otherwise
  4. Plan for later
    • Tagger accidental study (Richard). Tomorrow early a.m.? Will contact RadCon for final ok. Richard's proposal
    • Empty target run (target will already be emptied for accidental study).
    • Discussion of 24 GeV physics came up, physics ideas are welcome.

Friday, January 17 at 08:45

  1. Last 24 hours
    • High rate scan [1]
    • cDAQ
    • TOF thresholds
  2. Issues
  3. Tasks for today
    • Production data taking
    • RF recovery starting at 9 am
    • Accidental study (Richard), 1 pm. 2100 nA beam, most HVs will be turned off, empty target. RadCon will monitor. Richard's proposal
    • Empty target run (2 hr)
    • 30 min runs at 250 and 350 nA? To check number of rho, omegas / trigger. All subsystems ready?
  4. Plan for later
    • Happy three day weekend! 🙂 Production data. No studies or downtime planned until Tuesday.
    • Next meeting: Tuesday

Tuesday, January 21 at 08:45

  1. Since Friday meeting
    • Accidental study: success up to 2100 nA!
    • Empty target run
    • Production data over weekend: increase to 250 nA
    • Upload of most recent f250 firmware to PS, TAGH, TAGM. Timing changed afterwards, monitoring plots affected, updated calibrations to test.
  2. Issues
  3. Tasks for today
    • Downtime for several hours.
    • Controlled access: solenoid investigations, FCAL base replacements. Any others?
  4. Plan for later
    • Production, when we can!