Difference between revisions of "Run Planning Meeting Notes, Jan 25-Jan 31, 2018"

From GlueXWiki
Jump to: navigation, search
m
m
Line 7: Line 7:
 
#* After harp scan, about an hour has been spent on trigger and DAQ studies by Sasha and Sergei.
 
#* After harp scan, about an hour has been spent on trigger and DAQ studies by Sasha and Sergei.
 
#* We switched to production running at 7pm and has been taking production data since then.
 
#* We switched to production running at 7pm and has been taking production data since then.
 +
#* ABU (0.7+3.5+), BANU (0+0.3) for the last 3 shifts
 +
#* About xxxN triggers collected.
 
# Issues:
 
# Issues:
 
#* A couple of hours of beam time has been lost on fighting with DAQ while starting the next run (java out of memory, rebooting rocks, etc.)
 
#* A couple of hours of beam time has been lost on fighting with DAQ while starting the next run (java out of memory, rebooting rocks, etc.)
 
+
#* Sometime, a histogram or two would disappear in rootspy and reappear after monitoring restart.
 
+
#* Once, a coherent edge had to be nudged by more than 50 MeV.
#* Hall D switched from zero crossing to RF extracted [https://logbooks.jlab.org/entry/3460987] [https://logbooks.jlab.org/entry/3460994]
+
#* BCAL ADC/TDC timing offsets jumped by 32 ns for some modules: [https://logbooks.jlab.org/files/2018/01/3520512/BCAL_Timing.png]
#* No downtime incidents of more than 30 minutes after 8 hrs of beam studies
+
#* Harp scans: [https://logbooks.jlab.org/entry/3461066 5C11](MCC), [https://logbooks.jlab.org/entry/3461067 5C11B](MCC), [https://logbooks.jlab.org/entry/3461084 Radiator]
+
#** (Sigma_X,Sigma_Y) for this scan: (1.10, 0.39), (0.87, 0.20), (0.76, 0.12)
+

Revision as of 08:18, 25 January 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, January 25

  1. Notes from the previous 24 hrs:
    • Beam was off from 9am till 5:20 pm. At the end, Hall A was able to get their 22.5 uA current. Since then, beam was relatively stable.
    • Upon return of the beam, a harp scan was performed: MCC and Our harp. Beam seems to be acceptable.
    • After harp scan, about an hour has been spent on trigger and DAQ studies by Sasha and Sergei.
    • We switched to production running at 7pm and has been taking production data since then.
    • ABU (0.7+3.5+), BANU (0+0.3) for the last 3 shifts
    • About xxxN triggers collected.
  2. Issues:
    • A couple of hours of beam time has been lost on fighting with DAQ while starting the next run (java out of memory, rebooting rocks, etc.)
    • Sometime, a histogram or two would disappear in rootspy and reappear after monitoring restart.
    • Once, a coherent edge had to be nudged by more than 50 MeV.
    • BCAL ADC/TDC timing offsets jumped by 32 ns for some modules: [1]