Difference between revisions of "Run Planning Meeting Notes, Jan 25-Jan 31, 2018"

From GlueXWiki
Jump to: navigation, search
m
m
Line 8: Line 8:
 
#* The beam was acceptable but not as good as before [https://logbooks.jlab.org/entry/3520902].
 
#* The beam was acceptable but not as good as before [https://logbooks.jlab.org/entry/3520902].
 
#* Accelerator went down at 5:20am to investigate A->C bleed-thru.
 
#* Accelerator went down at 5:20am to investigate A->C bleed-thru.
 
 
#* ABU  hrs (5.6+5.1+ ), BANU  hrs (2.3+0.6+ ) for the last 3 shifts
 
#* ABU  hrs (5.6+5.1+ ), BANU  hrs (2.3+0.6+ ) for the last 3 shifts
#* About NNN triggers collected. Total: [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1635471172 Spreadsheet: number of  
+
#* About 2.4B triggers collected. Total: [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1635471172 Spreadsheet: number of triggers].
 
+
#* Switched to a different gateway for data transfer from Hall to CC [https://logbooks.jlab.org/entry/3520625].
 
# Issues:
 
# Issues:
 
#* [https://logbooks.jlab.org/entry/3521039 Hall D tagger credited control expires at midnight tonight]
 
#* [https://logbooks.jlab.org/entry/3521039 Hall D tagger credited control expires at midnight tonight]
 +
#* Switched to a different gateway for data transfer from Hall to CC [https://logbooks.jlab.org/entry/3520625].
 
#* 20 minutes have been lost on recovering TAGM after [https://logbooks.jlab.org/entry/3520683 bias voltage incident].
 
#* 20 minutes have been lost on recovering TAGM after [https://logbooks.jlab.org/entry/3520683 bias voltage incident].
#* 45 minutes have been lost on starting the run too late after the beam came back [https://logbooks.jlab.org/entry/3520688], [https://logbooks.jlab.org/entry/3520839].
+
#* At 2:15pm the beam went off for 45 minutes [https://logbooks.jlab.org/entry/3520688] but we were charged BANU for 45 minutes [https://logbooks.jlab.org/entry/3520839]?
 
+
#* RootSpy and  HLDetectorTiming plugin [https://logbooks.jlab.org/entry/3520833], [https://logbooks.jlab.org/entry/3521089].
 +
# Plan for today:
 +
#* 300nA AMO run together with L1 study from 7am until 10am.
 +
#* Controlled access at 10am for:
 +
#** RADCON
 +
#** TPOL noise
 +
#** TAGH cable connection
 +
#* Return to production after that.
 +
# Reports:
 +
#* [https://logbooks.jlab.org/entry/3520834 Collimation optimization studies].
  
 
==Thursday, January  25 ==
 
==Thursday, January  25 ==

Revision as of 07:58, 26 January 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Friday, January 26

  1. Notes from the previous 24 hours:
    • Beam was mostly up and we were taking production data.
    • From 6pm till 7:30pm, the beam was off to switch Hall B to 5-pass run.
    • At about the same time, 22.5uA were turned on for Hall A.
    • The beam was acceptable but not as good as before [1].
    • Accelerator went down at 5:20am to investigate A->C bleed-thru.
    • ABU hrs (5.6+5.1+ ), BANU hrs (2.3+0.6+ ) for the last 3 shifts
    • About 2.4B triggers collected. Total: Spreadsheet: number of triggers.
    • Switched to a different gateway for data transfer from Hall to CC [2].
  2. Issues:
  3. Plan for today:
    • 300nA AMO run together with L1 study from 7am until 10am.
    • Controlled access at 10am for:
      • RADCON
      • TPOL noise
      • TAGH cable connection
    • Return to production after that.
  4. Reports:

Thursday, January 25

  1. Notes from the previous 24 hrs:
    • Beam was off from 9am till 5:20 pm. At the end, Hall A was able to get their 22.5 uA current. Since then, beam was relatively stable.
    • Upon return of the beam, a harp scan was performed: MCC and Our harp. Beam seems to be acceptable.
    • After harp scan, about an hour has been spent on trigger and DAQ studies by Sasha and Sergei.
    • We switched to production running at 7pm and has been taking production data since then.
    • ABU 10.5 hrs (0.7+3.5+6.3), BANU 0.8 hrs (0+0.3+0.5) for the last 3 shifts
    • About 1.2 B triggers collected. Total: Spreadsheet: number of triggers
  2. Issues:
    • A couple of hours of beam time has been lost on fighting with DAQ while starting the next run (java out of memory, rebooting rocks, etc.)
    • Sometime, a histogram or two would disappear in rootspy and reappear after monitoring restart.
    • Once, a coherent edge had to be nudged by more than 50 MeV.
    • BCAL ADC/TDC timing offsets jumped by 32 ns for some modules: [8]
    • TAGM voltages
    • Any other issues?
  3. Short term run plan:
    • TAC run: should we do it today (Halls A and C are down)?
    • 2 hours of AMO 300nA running tomorrow morning.
      • Would it be better to start it at 7am or 8am?
      • Are any configuration changes necessary (HV, etc.)?
      • Who needs to be here for such run?
      • RADCON will follow this run with their Fast access study.
    • Consequent Hall controlled access to fix TPOL noise issue.
    • Simultaneous tagger hall access to fix bad TAGH channels.
    • Possible Saturday morning access as well.
    • Run plan chart: Week 3
  4. Reports: