Difference between revisions of "Run Planning Meeting Notes, Jan 30-Feb 05, 2020"

From GlueXWiki
Jump to: navigation, search
m
m
Line 26: Line 26:
 
#* Sunday:
 
#* Sunday:
 
# Changes
 
# Changes
#* Change in TPOL readout [https://logbooks.jlab.org/entry/3774906], [https://logbooks.jlab.org/entry/3774990], [https://logbooks.jlab.org/entry/3775221]
+
#* Change in TPOL readout [https://logbooks.jlab.org/entry/3774906], [https://logbooks.jlab.org/entry/3774990]
 
#* New DIRC SiPM TDC reference timing [https://logbooks.jlab.org/entry/3774941] - apparently, it's still not in ccdb.
 
#* New DIRC SiPM TDC reference timing [https://logbooks.jlab.org/entry/3774941] - apparently, it's still not in ccdb.
 
# Issues
 
# Issues
#* TPOL sector 23 only?
+
#* TPOL slot 13 channel 3 is always saturated [https://logbooks.jlab.org/entry/3775221]
 
#* Remote reset cable for T8-1-BOT needs to be repaired
 
#* Remote reset cable for T8-1-BOT needs to be repaired
 
# Noteworthy
 
# Noteworthy

Revision as of 22:30, 2 February 2020

Trigger Spreadsheet

Trigger Counter

Wednesday, February 5

  1. Last 24 hours
  2. Issues
  3. Reports
  4. Plans for today

Tuesday, February 4

  1. Last 24 hours
  2. Issues
  3. Reports
  4. Plans for today

Monday, February 3

  1. Last 72 hours
    • Friday:
      • No beam 10am-12pm (BLA calibration). Opportunistic Hall access
      • No beam 3pm-4pm (MCC software update)
      • No beam 4pm-11pm (lost vacuum in Hall C transport [1])
    • Saturday:
      • Goniometer stopped moving sometime between 5am and 3pm. The problem was only noticed at 3pm [2]. As a result, a few runs have unknown diamond orientation [3],[4]
      • Repair work on goniometer from 4pm till 7pm (no beam) [5]
    • Sunday:
  2. Changes
    • Change in TPOL readout [6], [7]
    • New DIRC SiPM TDC reference timing [8] - apparently, it's still not in ccdb.
  3. Issues
    • TPOL slot 13 channel 3 is always saturated [9]
    • Remote reset cable for T8-1-BOT needs to be repaired
  4. Noteworthy
    • MCC sees our radiator IN & OUT at the same time [10]
  5. Reports
    • Ratio of rates [11]
    • Vertex plots for empty target [12]
  6. Plans for today
    • Production

Friday, January 31

  1. Last 24 hours
    • JD70-106 47um diamond alignment till 4pm [13], [14]
    • Ion chambers had to be masked for alignment [15], [16]
    • Production since 4pm (~3.5B triggers)
  2. Issues
    • JD70-105 keeps degrading [17]
    • Periodic holes in DIRC occupancy [18]. Any way to recover without full DAQ reboot?
    • "Disappeared" DIRC SiPM TDC [19] - its timing recalibration is not done yet
    • Oh yes, Great Battle of the Mouse for 3 hrs :) [20]
  3. Reports
    • More on initial PS enhancement [21]
  4. Plans for today
    • We may (or may not) have ~30min for access at 10am
    • Production

Thursday, January 30

  1. Last 24 hours
    • Harp scan (~9am) [22]
    • Alignment of JD70-106 47um diamond (9:30am till 6pm) [23]
    • Production at 350nA (since 6pm). About 2.6B triggers collected.
  2. Issues
    • DIRC N-board lost connectivity for 30 minutes [24]
    • Gamma radiation at the racks [25]
    • Uncoupling of DIRC and FCAL light censors [26],[27]
    • Online monitoring issues [28] and fixed calibrations [29], [30]
  3. Reports
    • Initial PS enhancement Spring 2020 [31]
  4. Plans for today
    • Any more work on diamond alignment?
    • Production