Difference between revisions of "Run Planning Meeting Notes, Jan 30-Feb 05, 2020"
From GlueXWiki
m |
m |
||
Line 31: | Line 31: | ||
#* TPOL slot 13 channel 3 is always saturated [https://logbooks.jlab.org/entry/3775221] | #* TPOL slot 13 channel 3 is always saturated [https://logbooks.jlab.org/entry/3775221] | ||
#* Remote reset cable for T8-1-BOT needs to be repaired | #* Remote reset cable for T8-1-BOT needs to be repaired | ||
+ | #* Do we need a dumplette inserted for all goniometer movements? [https://logbooks.jlab.org/entry/3775551] | ||
# Noteworthy | # Noteworthy | ||
#* MCC sees our radiator IN & OUT at the same time [https://logbooks.jlab.org/entry/3774793] | #* MCC sees our radiator IN & OUT at the same time [https://logbooks.jlab.org/entry/3774793] |
Revision as of 22:49, 2 February 2020
Contents
Wednesday, February 5
- Last 24 hours
- Issues
- Reports
- Plans for today
Tuesday, February 4
- Last 24 hours
- Issues
- Reports
- Plans for today
Monday, February 3
- Last 72 hours
- Friday:
- No beam 10am-12pm (BLA calibration). Opportunistic Hall access
- No beam 3pm-4pm (MCC software update)
- No beam 4pm-11pm (lost vacuum in Hall C transport [1])
- Saturday:
- Sunday:
- Friday:
- Changes
- Issues
- Noteworthy
- MCC sees our radiator IN & OUT at the same time [11]
- Reports
- Plans for today
- Production
Friday, January 31
- Last 24 hours
- Issues
- Reports
- More on initial PS enhancement [22]
- Plans for today
- We may (or may not) have ~30min for access at 10am
- Production
Thursday, January 30
- Last 24 hours
- Issues
- Reports
- Initial PS enhancement Spring 2020 [32]
- Plans for today
- Any more work on diamond alignment?
- Production