==    Thursday, January 30 ==  
 
==    Thursday, January 30 ==  
 
# Last 24 hours
 
# Last 24 hours
 +
#* The latest harp scan [https://logbooks.jlab.org/entry/3773370]
 
#* Alignment of JD70-106 47um diamond [https://logbooks.jlab.org/entry/3773353]
 
#* Alignment of JD70-106 47um diamond [https://logbooks.jlab.org/entry/3773353]
 
#* Production at 350nA
 
#* Production at 350nA
 
# Issues
 
# Issues
#*  
+
#* DIRC N-board lost connectivity for 30 minutes [https://logbooks.jlab.org/entry/3773298]
 +
#* Gamma radiation at the racks [https://logbooks.jlab.org/entry/3773361]
 +
#* Uncoupling of DIRC and FCAL light censors [https://logbooks.jlab.org/entry/3773408],[https://logbooks.jlab.org/entry/3773454]
 
# Reports
 
# Reports
#*  
+
#* 2ns TAGM shifts have been calibrated out [https://logbooks.jlab.org/entry/3773444]
 +
#* Initial PS enhancement Spring 2020 [https://logbooks.jlab.org/entry/3773421]
 
# Plans for today
 
# Plans for today
 
#* Production
 
#* Production

Revision as of 17:34, 29 January 2020

Trigger Spreadsheet

Trigger Counter

Wednesday, February 5

  1. Last 24 hours
  2. Issues
  3. Reports
  4. Plans for today

Tuesday, February 4

  1. Last 24 hours
  2. Issues
  3. Reports
  4. Plans for today

Monday, February 3

  1. Last 72 hours
  2. Issues
  3. Reports
  4. Plans for today

Friday, January 31

  1. Last 24 hours
  2. Issues
  3. Reports
  4. Plans for today

Thursday, January 30

  1. Last 24 hours
    • The latest harp scan [1]
    • Alignment of JD70-106 47um diamond [2]
    • Production at 350nA
  2. Issues
    • DIRC N-board lost connectivity for 30 minutes [3]
    • Gamma radiation at the racks [4]
    • Uncoupling of DIRC and FCAL light censors [5],[6]
  3. Reports
    • 2ns TAGM shifts have been calibrated out [7]
    • Initial PS enhancement Spring 2020 [8]
  4. Plans for today
    • Production