Difference between revisions of "Run Planning Meeting Notes, Jan 30-Feb 05, 2020"

From GlueXWiki
Jump to: navigation, search
m
m
Line 29: Line 29:
 
==    Thursday, January 30 ==  
 
==    Thursday, January 30 ==  
 
# Last 24 hours
 
# Last 24 hours
#* The latest harp scan [https://logbooks.jlab.org/entry/3773370]
+
#* Harp scan (~9am) [https://logbooks.jlab.org/entry/3773370]
#* Alignment of JD70-106 47um diamond [https://logbooks.jlab.org/entry/3773353]
+
#* Alignment of JD70-106 47um diamond (9:30am till 6pm) [https://logbooks.jlab.org/entry/3773353]
#* Production at 350nA
+
#* Production at 350nA (since 6pm). About 2.6B triggers collected.
 
# Issues
 
# Issues
 
#* DIRC N-board lost connectivity for 30 minutes [https://logbooks.jlab.org/entry/3773298]
 
#* DIRC N-board lost connectivity for 30 minutes [https://logbooks.jlab.org/entry/3773298]
 
#* Gamma radiation at the racks [https://logbooks.jlab.org/entry/3773361]
 
#* Gamma radiation at the racks [https://logbooks.jlab.org/entry/3773361]
 
#* Uncoupling of DIRC and FCAL light censors [https://logbooks.jlab.org/entry/3773408],[https://logbooks.jlab.org/entry/3773454]
 
#* Uncoupling of DIRC and FCAL light censors [https://logbooks.jlab.org/entry/3773408],[https://logbooks.jlab.org/entry/3773454]
 +
#* Online monitoring issues [https://logbooks.jlab.org/entry/3773745] and
 +
fixed calibrations [https://logbooks.jlab.org/entry/3773444], [https://logbooks.jlab.org/files/2020/01/3773745/OnlineRF.png]
 
# Reports
 
# Reports
#* 2ns TAGM shifts have been calibrated out [https://logbooks.jlab.org/entry/3773444]
 
 
#* Initial PS enhancement Spring 2020 [https://logbooks.jlab.org/entry/3773421]
 
#* Initial PS enhancement Spring 2020 [https://logbooks.jlab.org/entry/3773421]
 
# Plans for today
 
# Plans for today
 
#* Production
 
#* Production

Revision as of 07:26, 30 January 2020

Trigger Spreadsheet

Trigger Counter

Wednesday, February 5

  1. Last 24 hours
  2. Issues
  3. Reports
  4. Plans for today

Tuesday, February 4

  1. Last 24 hours
  2. Issues
  3. Reports
  4. Plans for today

Monday, February 3

  1. Last 72 hours
  2. Issues
  3. Reports
  4. Plans for today

Friday, January 31

  1. Last 24 hours
  2. Issues
  3. Reports
  4. Plans for today

Thursday, January 30

  1. Last 24 hours
    • Harp scan (~9am) [1]
    • Alignment of JD70-106 47um diamond (9:30am till 6pm) [2]
    • Production at 350nA (since 6pm). About 2.6B triggers collected.
  2. Issues
    • DIRC N-board lost connectivity for 30 minutes [3]
    • Gamma radiation at the racks [4]
    • Uncoupling of DIRC and FCAL light censors [5],[6]
    • Online monitoring issues [7] and

fixed calibrations [8], [9]

  1. Reports
    • Initial PS enhancement Spring 2020 [10]
  2. Plans for today
    • Production