Difference between revisions of "Run Planning Meeting Notes, Jan 30-Feb 05, 2020"

From GlueXWiki
Jump to: navigation, search
m
m
Line 36: Line 36:
 
#* Gamma radiation at the racks [https://logbooks.jlab.org/entry/3773361]
 
#* Gamma radiation at the racks [https://logbooks.jlab.org/entry/3773361]
 
#* Uncoupling of DIRC and FCAL light censors [https://logbooks.jlab.org/entry/3773408],[https://logbooks.jlab.org/entry/3773454]
 
#* Uncoupling of DIRC and FCAL light censors [https://logbooks.jlab.org/entry/3773408],[https://logbooks.jlab.org/entry/3773454]
#* Online monitoring issues [https://logbooks.jlab.org/entry/3773745] and
+
#* Online monitoring issues [https://logbooks.jlab.org/entry/3773745] and fixed calibrations [https://logbooks.jlab.org/entry/3773444], [https://logbooks.jlab.org/files/2020/01/3773745/OnlineRF.png]
fixed calibrations [https://logbooks.jlab.org/entry/3773444], [https://logbooks.jlab.org/files/2020/01/3773745/OnlineRF.png]
+
 
# Reports
 
# Reports
 
#* Initial PS enhancement Spring 2020 [https://logbooks.jlab.org/entry/3773421]
 
#* Initial PS enhancement Spring 2020 [https://logbooks.jlab.org/entry/3773421]

Revision as of 07:51, 30 January 2020

Trigger Spreadsheet

Trigger Counter

Wednesday, February 5

  1. Last 24 hours
  2. Issues
  3. Reports
  4. Plans for today

Tuesday, February 4

  1. Last 24 hours
  2. Issues
  3. Reports
  4. Plans for today

Monday, February 3

  1. Last 72 hours
  2. Issues
  3. Reports
  4. Plans for today

Friday, January 31

  1. Last 24 hours
  2. Issues
  3. Reports
  4. Plans for today

Thursday, January 30

  1. Last 24 hours
    • Harp scan (~9am) [1]
    • Alignment of JD70-106 47um diamond (9:30am till 6pm) [2]
    • Production at 350nA (since 6pm). About 2.6B triggers collected.
  2. Issues
    • DIRC N-board lost connectivity for 30 minutes [3]
    • Gamma radiation at the racks [4]
    • Uncoupling of DIRC and FCAL light censors [5],[6]
    • Online monitoring issues [7] and fixed calibrations [8], [9]
  3. Reports
    • Initial PS enhancement Spring 2020 [10]
  4. Plans for today
    • Continue with diamond alignment?
    • Production