Difference between revisions of "Run Planning Meeting Notes, Jan 30-Feb 05, 2020"

From GlueXWiki
Jump to: navigation, search
m
m
Line 23: Line 23:
 
==    Friday, January 31 ==  
 
==    Friday, January 31 ==  
 
# Last 24 hours
 
# Last 24 hours
#* JD70-106 47um diamond alignment till 4pm
+
#* JD70-106 47um diamond alignment till 4pm [https://logbooks.jlab.org/entry/3774039], [https://logbooks.jlab.org/entry/3774172]
 
#* Production since 4pm
 
#* Production since 4pm
 
# Issues
 
# Issues
 +
#* JD70-105 keeps degrading [https://logbooks.jlab.org/entry/3774036]
 +
#* Periodic holes in DIRC occupancy [https://logbooks.jlab.org/entry/3774125]
 
# Reports
 
# Reports
 
# Plans for today
 
# Plans for today

Revision as of 07:05, 31 January 2020

Trigger Spreadsheet

Trigger Counter

Wednesday, February 5

  1. Last 24 hours
  2. Issues
  3. Reports
  4. Plans for today

Tuesday, February 4

  1. Last 24 hours
  2. Issues
  3. Reports
  4. Plans for today

Monday, February 3

  1. Last 72 hours
  2. Issues
  3. Reports
  4. Plans for today

Friday, January 31

  1. Last 24 hours
    • JD70-106 47um diamond alignment till 4pm [1], [2]
    • Production since 4pm
  2. Issues
    • JD70-105 keeps degrading [3]
    • Periodic holes in DIRC occupancy [4]
  3. Reports
  4. Plans for today
    • Test run with JD70-106 diamond?
    • Production

Thursday, January 30

  1. Last 24 hours
    • Harp scan (~9am) [5]
    • Alignment of JD70-106 47um diamond (9:30am till 6pm) [6]
    • Production at 350nA (since 6pm). About 2.6B triggers collected.
  2. Issues
    • DIRC N-board lost connectivity for 30 minutes [7]
    • Gamma radiation at the racks [8]
    • Uncoupling of DIRC and FCAL light censors [9],[10]
    • Online monitoring issues [11] and fixed calibrations [12], [13]
  3. Reports
    • Initial PS enhancement Spring 2020 [14]
  4. Plans for today
    • Any more work on diamond alignment?
    • Production