Run Planning Meeting Notes, Jan 30-Feb 05, 2020

From GlueXWiki
Revision as of 18:43, 31 January 2020 by Ostrov (Talk | contribs)

Jump to: navigation, search

Trigger Spreadsheet

Trigger Counter

Wednesday, February 5

  1. Last 24 hours
  2. Issues
  3. Reports
  4. Plans for today

Tuesday, February 4

  1. Last 24 hours
  2. Issues
  3. Reports
  4. Plans for today

Monday, February 3

  1. Last 72 hours
    • No beam since 4pm Friday due to lost vacuum in Hall C transport [1]
  2. Issues
    • MCC sees our radiator IN & OUT at the same time [2]
  3. Reports
  4. Plans for today

Friday, January 31

  1. Last 24 hours
    • JD70-106 47um diamond alignment till 4pm [3], [4]
    • Ion chambers had to be masked for alignment [5], [6]
    • Production since 4pm (~3.5B triggers)
  2. Issues
    • JD70-105 keeps degrading [7]
    • Periodic holes in DIRC occupancy [8]. Any way to recover without full DAQ reboot?
    • "Disappeared" DIRC SiPM TDC [9] - its timing recalibration is not done yet
    • Oh yes, Great Battle of the Mouse for 3 hrs :) [10]
  3. Reports
    • More on initial PS enhancement [11]
  4. Plans for today
    • We may (or may not) have ~30min for access at 10am
    • Production

Thursday, January 30

  1. Last 24 hours
    • Harp scan (~9am) [12]
    • Alignment of JD70-106 47um diamond (9:30am till 6pm) [13]
    • Production at 350nA (since 6pm). About 2.6B triggers collected.
  2. Issues
    • DIRC N-board lost connectivity for 30 minutes [14]
    • Gamma radiation at the racks [15]
    • Uncoupling of DIRC and FCAL light censors [16],[17]
    • Online monitoring issues [18] and fixed calibrations [19], [20]
  3. Reports
    • Initial PS enhancement Spring 2020 [21]
  4. Plans for today
    • Any more work on diamond alignment?
    • Production