Run Planning Meeting Notes, Jan 30-Feb 05, 2020

From GlueXWiki
Revision as of 09:53, 31 January 2020 by Ostrov (Talk | contribs)

Jump to: navigation, search

Trigger Spreadsheet

Trigger Counter

Wednesday, February 5

  1. Last 24 hours
  2. Issues
  3. Reports
  4. Plans for today

Tuesday, February 4

  1. Last 24 hours
  2. Issues
  3. Reports
  4. Plans for today

Monday, February 3

  1. Last 72 hours
  2. Issues
  3. Reports
  4. Plans for today

Friday, January 31

  1. Last 24 hours
    • JD70-106 47um diamond alignment till 4pm [1], [2]
    • Ion chambers had to be masked for alignment [3], [4]
    • Production since 4pm (~3.5B triggers)
  2. Issues
    • JD70-105 keeps degrading [5]
    • Periodic holes in DIRC occupancy [6]. Any way to recover without full DAQ reboot?
    • "Disappeared" DIRC SiPM TDC [7] - its timing recalibration is not done yet
    • Oh yes, Great Battle of the Mouse for 3 hrs :) [8]
  3. Reports
    • More on initial PS enhancement [9]
  4. Plans for today
    • We may (or may not) have ~30min for access at 10am
    • Production

Thursday, January 30

  1. Last 24 hours
    • Harp scan (~9am) [10]
    • Alignment of JD70-106 47um diamond (9:30am till 6pm) [11]
    • Production at 350nA (since 6pm). About 2.6B triggers collected.
  2. Issues
    • DIRC N-board lost connectivity for 30 minutes [12]
    • Gamma radiation at the racks [13]
    • Uncoupling of DIRC and FCAL light censors [14],[15]
    • Online monitoring issues [16] and fixed calibrations [17], [18]
  3. Reports
    • Initial PS enhancement Spring 2020 [19]
  4. Plans for today
    • Any more work on diamond alignment?
    • Production