=Sunday, January 15=
+
= Monday, January 16=
 +
=== Past 24 hours ===
 +
* Continued comissioning phase
 +
** Photon flux optimization and Active Collimator calibration.
 +
** microscope alignment with motor
 +
** microscope HV scan
 +
** Reestablish L1 trigger; partially
 +
 
 +
* To-do
 +
** Diamond alignment
 +
** Complete L1 trigger
 +
** PS and TAGH HV Scan
 +
** once at 350 nA, redo CDC HV scan
 +
 
 +
 
 +
* Shift Summary
 +
** [ Day Friday]
 +
** [ Swing Friday]
 +
** [ Owl Friday/Saturday]
 +
** [ Early Riser Saturday]
 +
 
 +
* ABUs:  0.0 h
 +
* Data Summary: ~0 B triggers on empty target
 +
 
 +
=== Issues ===
 +
* 320 nA beam limit on beam authorization
 +
* FCAL HV trips while trying to do detector calibrations with beam on profiler
 +
*Covid incident levels high; mass wearing onsite mandatory
 +
=== Plan ===
 +
* We are
 +
* Link to runplan: https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Spring2023#Runplan
 +
* Items left
 +
** Photon transmission and active collimator calibration (happening ri=Sunday, January 15=
 
=== Past 24 hours ===
 
=== Past 24 hours ===
 
* Started comissioning phase
 
* Started comissioning phase
Line 33: Line 65:
 
** Photon transmission and active collimator calibration (happening ri
 
** Photon transmission and active collimator calibration (happening ri
  
 +
=Sunday, January 15=
 +
=== Past 24 hours ===
 +
* Started comissioning phase
 +
*
  
 +
* Shift Summary
 +
** [ Day Friday]
 +
** [ Swing Friday]
 +
** [ Owl Friday/Saturday]
 +
** [ Early Riser Saturday]
  
 +
* ABUs:  0.0 h
 +
* Data Summary: ~0 B triggers on empty target
  
 
+
=== Issues ===
 
+
* 320 nA beam limit on beam authorization
 +
* FCAL HV trips while trying to do detector calibrations with beam on profiler
 +
*Covid incident levels high; mass wearing onsite mandatory
 +
=== Plan ===
 +
* We are
 +
* Link to runplan: https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Spring2023#Runplan
 +
* Items left
 +
** Photon transmission and active collimator calibration (happening ri
  
 
=Saturday, January 14=
 
=Saturday, January 14=

Revision as of 10:17, 16 January 2023

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Monday, January 16

Past 24 hours

  • Continued comissioning phase
    • Photon flux optimization and Active Collimator calibration.
    • microscope alignment with motor
    • microscope HV scan
    • Reestablish L1 trigger; partially
  • To-do
    • Diamond alignment
    • Complete L1 trigger
    • PS and TAGH HV Scan
    • once at 350 nA, redo CDC HV scan


  • Shift Summary
    • [ Day Friday]
    • [ Swing Friday]
    • [ Owl Friday/Saturday]
    • [ Early Riser Saturday]
  • ABUs: 0.0 h
  • Data Summary: ~0 B triggers on empty target

Issues

  • 320 nA beam limit on beam authorization
  • FCAL HV trips while trying to do detector calibrations with beam on profiler
  • Covid incident levels high; mass wearing onsite mandatory

Plan

Past 24 hours

  • Started comissioning phase
  • Shift Summary
    • [ Day Friday]
    • [ Swing Friday]
    • [ Owl Friday/Saturday]
    • [ Early Riser Saturday]
  • ABUs: 0.0 h
  • Data Summary: ~0 B triggers on empty target

Issues

  • 320 nA beam limit on beam authorization
  • FCAL HV trips while trying to do detector calibrations with beam on profiler
  • Covid incident levels high; mass wearing onsite mandatory

Plan

Sunday, January 15

Past 24 hours

  • Started comissioning phase
  • Shift Summary
    • [ Day Friday]
    • [ Swing Friday]
    • [ Owl Friday/Saturday]
    • [ Early Riser Saturday]
  • ABUs: 0.0 h
  • Data Summary: ~0 B triggers on empty target

Issues

  • 320 nA beam limit on beam authorization
  • FCAL HV trips while trying to do detector calibrations with beam on profiler
  • Covid incident levels high; mass wearing onsite mandatory

Plan

Saturday, January 14

Past 24 hours

  • first beam that registers on BCM to hall on Friday at 23:00
  • since then on and off again tuned beam to tagger hall but no usable beam yet
  • observe frequent halo counter trips
  • ABUs: 0.0 h
  • Data Summary: ~0 B triggers on empty target

Issues

  • Covid incident levels high; mass wearing onsite mandatory

Plan

Friday, January 13

Past 24 hours

  • HCO and last preps finished shortly after 5 pm
  • No beam to hall yet
  • Shift Summary
  • ABUs: 0.0 h
  • Data Summary: ~0 B triggers on empty target


Issues

  • Run Control did not work last night when crew tried cosmic data; lost a sock
  • Covid incident levels high; expect notofaction of mask mandate, or better start wearing one now.

Plan