Difference between revisions of "Run Planning Meeting Notes, January 19 - January 25, 2023"

From GlueXWiki
Jump to: navigation, search
(Friday January 20)
Line 23: Line 23:
 
**[https://logbooks.jlab.org/entry/4113029 Comparison of 2020 and 2023 for TAGH rates (A. Deur)]
 
**[https://logbooks.jlab.org/entry/4113029 Comparison of 2020 and 2023 for TAGH rates (A. Deur)]
 
**[https://logbooks.jlab.org/entry/4113193 Check that TAGH counters scale with (A. Deur)]
 
**[https://logbooks.jlab.org/entry/4113193 Check that TAGH counters scale with (A. Deur)]
**[https://logbooks.jlab.org/entry/4113098 rho and pi0 yields (A. Austregesilo]  
+
**[https://logbooks.jlab.org/entry/4113098 rho and pi0 yields (A. Austregesilo)]  
  
 
=== Plans ===
 
=== Plans ===
* Beam off starting around 10am for RF study, nominally until 4pm+/-4h.  
+
* Thursday evening and Friday night:
 +
**Once beam come back, do Harp scans.
 +
**FCup test of our beam dump BCM.
 +
**Run 1h on the amo radiator of the goni (baseline for next runs below). 250 nA
 +
**Run 2h on 0.19E-4 RL amo radiator on radiator ladder (250 nA).
 +
**Run 2h on 1.12E-4 RL amo radiator on radiator ladder (250 nA).
 +
**Run (until the beam is taken away in the morning) on 3.4E-4 RL amo radiator on radiator ladder (250 nA).
 +
* Beam off starting Friday morning around 7:30am to fix vacuum issue in south linac, until 4pm.  
 
* Hall in controlled access?
 
* Hall in controlled access?
* Diamond alignment: Friday day ? (Hovanes unavailable today)
+
* Diamond alignment: ?
* Until Friday day, production on amorphous?
+
* Until then production on amorphous.
 
* [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Spring2023#Runplan Link to runplan]
 
* [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Spring2023#Runplan Link to runplan]
  

Revision as of 19:24, 19 January 2023

Friday January 20

Past 24 hours

  • Ran on amorphous radiator (250 nA) until 10am. Then, beam was taken away for beam and RF study. Beam came back around 5:30pm. We did harp scans and **** ABU= **h for the day
  • Several accesses done during the day:
    • Sasha (FADC replacement for TOF)
    • Sergey

Shift Reports

  • [ Day shift summary]
  • [ Swing shift summary]
  • [ Owl shift summary]
  • [ Early Riser shift summary]

Reports


Issues

Plans

  • Thursday evening and Friday night:
    • Once beam come back, do Harp scans.
    • FCup test of our beam dump BCM.
    • Run 1h on the amo radiator of the goni (baseline for next runs below). 250 nA
    • Run 2h on 0.19E-4 RL amo radiator on radiator ladder (250 nA).
    • Run 2h on 1.12E-4 RL amo radiator on radiator ladder (250 nA).
    • Run (until the beam is taken away in the morning) on 3.4E-4 RL amo radiator on radiator ladder (250 nA).
  • Beam off starting Friday morning around 7:30am to fix vacuum issue in south linac, until 4pm.
  • Hall in controlled access?
  • Diamond alignment: ?
  • Until then production on amorphous.
  • Link to runplan

Thursday January 19

Past 24 hours

  • Ran on empty target until 7:20am. Then, beam was taken away for beam and RF study and acceptable beam came back only Thursday at 1:10am. ABU= 4h for the day
  • refilled the target around 4:15pm.
  • Several accesses done during the day:
    • Scott
    • Sergey
    • David Lawrence
    • Cody
  • Took amorphous data, starting around 1:10am after aborted attempt to check diamond alignment.

Shift Reports

Reports

Issues

Plans

  • Beam off starting around 10am for RF study, nominally until 4pm+/-4h.
  • Hall in controlled access?
  • Diamond alignment: Friday day ? (Hovanes unavailable today)
  • Until Friday day, production on amorphous?
  • Link to runplan