= Wednesday January 24 =
 +
=== Past 24 hours ===
 +
* Beam study, with Hall D access. Then, production on diamond. ABU= 12.2 h for the day.
 +
 +
=== Shift Reports ===
 +
* [https://logbooks.jlab.org/entry/4116249 Day shift summary]
 +
* [https://logbooks.jlab.org/entry/4116506 Swing shift summary]
 +
* [https://logbooks.jlab.org/entry/4116677 Owl shift summary]
 +
* [https://logbooks.jlab.org/entry/4116888 Early Riser shift summary]
 +
 +
=== Reports ===
 +
* During Access, a certain number of problems were fixed:
 +
** [https://logbooks.jlab.org/entry/4116277 The TAGH HV crate power was cycled (A. Somov)] (See original problem [https://logbooks.jlab.org/entry/4116043 here])
 +
** [https://logbooks.jlab.org/entry/4116279 Target remote control was fixed (C. Carlin)]
 +
** [https://logbooks.jlab.org/entry/4116374 Misbehaving pressure sensor was taken care of(Scot)]. [It looks fine now (Beni)] and [agrees with Newportnews weather station (Naomi)]. Spare sensor was ordered. Should we restore the sensor in the alarm and the usual instruction to stop run if the alarm goes off?
 +
** NMR probe fixed (Tim/Scot). Then [https://logbooks.jlab.org/entry/4116505 it froze again] until this morning, 6:24am. [https://logbooks.jlab.org/entry/4116955 Now it is working again after Scot cycled it]. Linked to Tagger magnet DCCT current sensor cycling. 
 +
** Malte and Mark Dalton worked on FCal.
 +
** Justin worked on DIRC LED issue.
 +
** Scot had Vlad's chiller taken out of the Hall.
 +
* [https://logbooks.jlab.org/entry/4116246 Diamond orientations are consistent with 2020 (Alexander Austregesilo)]
 +
* [https://logbooks.jlab.org/entry/4117016 Energy monitoring for Winter 2023 GlueX-II run]
 +
 +
=== Issues ===
 +
* [https://logbooks.jlab.org/entry/4116334 Start counter 96 degree rotation in cabling or software space (Simon)]
 +
* [https://logbooks.jlab.org/entry/4116427 DIRC LED TDC missing (David Lawrence, Justin]
 +
* [https://logbooks.jlab.org/entry/4116199 TOF timing (Beni)]. Later [https://logbooks.jlab.org/entry/4116298 fixed by Sean].
 +
* [https://logbooks.jlab.org/entry/4116959 Long DAQ problem:~1.5h (Alison Laduke/Sergei Furletov)]. See also [https://logbooks.jlab.org/entry/4116888 Early Riser shift summary]
 +
* BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done last Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period.
 +
* [https://logbooks.jlab.org/entry/4116888 A request for the kitchen lights to be fixed should be submitted next time there is beam downtime.]
 +
 +
=== Plans ===
 +
* Production (300 nA, 2h runs) with cycle:
 +
**2 runs para(0/90)
 +
**2 runs perp(0/90)
 +
**2 runs para(45/135)
 +
**2 runs perp(45/135)
 +
**1 run amo (use it to rejuvenate amo reference in CBREM GUI)
 +
* Trigger fine tuning Thursday? (A. Somov)
 +
 +
= Tuesday January 24 =
 +
=== Past 24 hours ===
 +
* Production on diamond. Trippy beam, but good availability. ABU=16.2h for the day
 +
 +
=== Shift Reports ===
 +
* [https://logbooks.jlab.org/entry/4115595 Day shift summary]
 +
* [https://logbooks.jlab.org/entry/4115786 Swing shift summary]
 +
* [https://logbooks.jlab.org/entry/4116022 Owl shift summary]
 +
* [https://logbooks.jlab.org/entry/4116083 Early Riser shift summary]
 +
 +
=== Reports ===
 +
* [https://logbooks.jlab.org/files/2023/01/4115541/Hall%20D%20Electron%20Beam%20Harp%20Scan%202D%20Fitting%20Tool.pdf Beam profile from Harp scan done Monday morning looks good]
 +
* [https://logbooks.jlab.org/entry/4115569 Coherent peak enhancement fit for 2023 (Justin)]
 +
* [https://logbooks.jlab.org/entry/4115527 Start Counter performance (Beni)]
 +
* [https://logbooks.jlab.org/entry/4115731 Rates comparison for GlueX, PrimEx and CPP/NPP (Alexandre D.)]
 +
* [https://logbooks.jlab.org/entry/4115667 Start Counter detector walk (Beni)]
 +
 +
=== Issues ===
 +
* [https://logbooks.jlab.org/entry/4116043 Tagger Hodoscope HV communication problem (Jon Zarling)]
 +
* Main trigger scaler freeze goes unnoticed: [https://logbooks.jlab.org/entry/4114856 Sunday], [https://logbooks.jlab.org/entry/4116137 Monday] Can we include them in the scaler summary gui, so it is easy for the shift people to see them?
 +
* [https://logbooks.jlab.org/entry/4115830 NMR probe not communicating.]. It started around 4pm Monday. DCCT current monitor for the tagger is also down.([https://logbooks.jlab.org/entry/4116083 See also Early Riser shift summary])
 +
 +
=== Plans ===
 +
* 4h of beam studies + 2h beam restoration). Tagger and Hall to be surveyed around 9pm:
 +
** Safety Walkthrough (M. Dalton + trainee(s))?
 +
** Scot to access to take out Vlad's chiller
 +
** Tagger access for HV communication issue?
 +
** Investigate the faulty pressure sensor?
 +
** Chris Carlin to fix the target controls
 +
* Production (300 nA, 2h runs) with cycle:
 +
**2 runs para(0/90)
 +
**2 runs perp(0/90)
 +
**2 runs para(45/135)
 +
**2 runs perp(45/135)
 +
**1 run amo
 +
 
= Monday January 23 =
 
= Monday January 23 =
 
=== Past 72 hours ===
 
=== Past 72 hours ===

Latest revision as of 09:06, 25 January 2023

Wednesday January 24

Past 24 hours

  • Beam study, with Hall D access. Then, production on diamond. ABU= 12.2 h for the day.

Shift Reports

Reports

Issues

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)
  • Trigger fine tuning Thursday? (A. Somov)

Tuesday January 24

Past 24 hours

  • Production on diamond. Trippy beam, but good availability. ABU=16.2h for the day

Shift Reports

Reports

Issues

Plans

  • 4h of beam studies + 2h beam restoration). Tagger and Hall to be surveyed around 9pm:
    • Safety Walkthrough (M. Dalton + trainee(s))?
    • Scot to access to take out Vlad's chiller
    • Tagger access for HV communication issue?
    • Investigate the faulty pressure sensor?
    • Chris Carlin to fix the target controls
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo

Monday January 23

Past 72 hours

  • Beam was off from Friday 7:30am to Saturday 2am due to vacuum issue in south linac. Friday ABU: 4.0h
  • Saturday: Ran on amorphous (goni), 300 nA. Until Sunday 9am when Hovanes started diamond alignment. Saturday ABU: 18.6h
  • Sunday 9am-5:30pm: diamond alignment. Sunday 8:30pm - Monday 7:30am: First production 0/90/45/135/amo cycle (see CBrem peak). Then did Harp scans. Sunday ABU: 14.3h

Shift Reports

Reports

Issues

Plans

  • Production on amorphous (Goni, 300 nA) until the diamond is aligned.
  • Diamond alignment: Sunday morning, ~9am. (Hovanes)
  • Then production on diamond radiator, 4 orientations + amo. 300 nA. Presently, we do each orientation once (not twice) and each run is nominally 2h, including the amo run.
  • Tomorrow (Tuesday, 24th: 4h of beam studies + 2h beam restoration):
    •  ?Safety Walkthrough (M. Dalton + trainee(s))?
    • Scot to access to take out Vlad's chiller
    •  ?Investigate the faulty pressure sensor?
    •  ?Chris Carlin to fix the target controls?
  • Link to runplan

Friday January 20

Past 24 hours

Shift Reports

Reports

Issues

Plans

  • Thursday evening and Friday night:
    • Once beam come back, do Harp scans.
    • FCup test of our beam dump BCM.
    • Run 1h on the amo radiator of the goni (baseline for next runs below). 250 nA
    • Run 2h on 0.19E-4 RL amo radiator on radiator ladder (250 nA).
    • Run 2h on 1.12E-4 RL amo radiator on radiator ladder (250 nA).
    • Run (until the beam is taken away in the morning) on 3.4E-4 RL amo radiator on radiator ladder (250 nA).
  • Beam off starting Friday morning around 7:30am to fix vacuum issue in south linac, until 4pm(?).
  • When the beam comes back:
    • Harp scans
    • Production on goni amo radiator at 300 nA until Sunday morning.
  • Hall access:
    • Sergey F.
  • Diamond alignment: Sunday morning, ~9am.
  • Until then production on amorphous.
  • Link to runplan

Thursday January 19

Past 24 hours

  • Ran on empty target until 7:20am. Then, beam was taken away for beam and RF study and acceptable beam came back only Thursday at 1:10am. ABU= 4h for the day
  • refilled the target around 4:15pm.
  • Several accesses done during the day:
    • Scot
    • Sergey
    • David Lawrence
    • Cody
  • Took amorphous data, starting around 1:10am after aborted attempt to check diamond alignment.

Shift Reports

Reports

Issues

Plans

  • Beam off starting around 10am for RF study, nominally until 4pm+/-4h.
  • Hall in controlled access?
  • Diamond alignment: Friday day ? (Hovanes unavailable today)
  • Until Friday day, production on amorphous?
  • Link to runplan