= Friday January 20 =
 +
=== Past 24 hours ===
 +
* Ran on amorphous radiator (250 nA) until 10am. Then, beam was taken away for beam and RF study. Beam came back around 5:30pm. We did harp scans and **** ABU= **h for the day
 +
* Several accesses done during the day:
 +
** Sasha (FADC replacement for TOF)
 +
** Sergey
 +
 +
=== Shift Reports ===
 +
* [ Day shift summary]
 +
* [ Swing shift summary]
 +
* [ Owl shift summary]
 +
* [ Early Riser shift summary]
 +
 +
=== Reports ===
 +
* [ Harp scans]
 +
* [https://logbooks.jlab.org/entry/4113076 FADC replacement for TOF (A. Somov)]
 +
 +
 +
=== Issues ===
 +
* [https://logbooks.jlab.org/entry/4113047 Beam energy oscillation investigation (M. Tiefenback)]
 +
* 30% increase in transmission compared to Summer 2020 run.
 +
**[https://logbooks.jlab.org/entry/4111933 Original finding by A. Somov]
 +
**[https://logbooks.jlab.org/entry/4113029 Comparison of 2020 and 2023 for TAGH rates (A. Deur)]
 +
**[https://logbooks.jlab.org/entry/4113193 Check that TAGH counters scale with (A. Deur)]
 +
**[https://logbooks.jlab.org/entry/4113098 rho and pi0 yields (A. Austregesilo]
 +
 +
=== Plans ===
 +
* Beam off starting around 10am for RF study, nominally until 4pm+/-4h.
 +
* Hall in controlled access?
 +
* Diamond alignment: Friday day ? (Hovanes unavailable today)
 +
* Until Friday day, production on amorphous?
 +
* [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Spring2023#Runplan Link to runplan]
 +
 
= Thursday January 19 =
 
= Thursday January 19 =
 
=== Past 24 hours ===
 
=== Past 24 hours ===

Revision as of 19:17, 19 January 2023

Friday January 20

Past 24 hours

  • Ran on amorphous radiator (250 nA) until 10am. Then, beam was taken away for beam and RF study. Beam came back around 5:30pm. We did harp scans and **** ABU= **h for the day
  • Several accesses done during the day:
    • Sasha (FADC replacement for TOF)
    • Sergey

Shift Reports

  • [ Day shift summary]
  • [ Swing shift summary]
  • [ Owl shift summary]
  • [ Early Riser shift summary]

Reports


Issues

Plans

  • Beam off starting around 10am for RF study, nominally until 4pm+/-4h.
  • Hall in controlled access?
  • Diamond alignment: Friday day ? (Hovanes unavailable today)
  • Until Friday day, production on amorphous?
  • Link to runplan

Thursday January 19

Past 24 hours

  • Ran on empty target until 7:20am. Then, beam was taken away for beam and RF study and acceptable beam came back only Thursday at 1:10am. ABU= 4h for the day
  • refilled the target around 4:15pm.
  • Several accesses done during the day:
    • Scott
    • Sergey
    • David Lawrence
    • Cody
  • Took amorphous data, starting around 1:10am after aborted attempt to check diamond alignment.

Shift Reports

Reports

Issues

Plans

  • Beam off starting around 10am for RF study, nominally until 4pm+/-4h.
  • Hall in controlled access?
  • Diamond alignment: Friday day ? (Hovanes unavailable today)
  • Until Friday day, production on amorphous?
  • Link to runplan