Difference between revisions of "Run Planning Meeting Notes, January 26 - February 1, 2023"

From GlueXWiki
Jump to: navigation, search
m (Issues)
m (Issues)
Line 61: Line 61:
 
=== Issues ===
 
=== Issues ===
 
[https://logbooks.jlab.org/entry/4117764 Start Counter HV match test (Beni)] Given the results of this test, the next step is to figure out if there is a physical rotation on the counter.
 
[https://logbooks.jlab.org/entry/4117764 Start Counter HV match test (Beni)] Given the results of this test, the next step is to figure out if there is a physical rotation on the counter.
 
+
[https://logbooks.jlab.org/entry/4117831 DIRC SiPM Update (Justin)] The inverter box was installed. However the TDC scaler still shows zero occupancy in channel 30 of slot 8.
<!--
+
* [https://logbooks.jlab.org/entry/4116427 DIRC LED TDC missing (David Lawrence, Justin)] [https://logbooks.jlab.org/entry/4117275 DIRC SiPM reference signal (Justin)]
+
**Tentative plan of action: Chris Stanislav will have a spare this afternoon and Justin will install during an opportunistic access
+
-->
+
  
 
Pending:
 
Pending:

Revision as of 16:36, 26 January 2023

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Thursday January 26

Past 24 hours

  • Production on diamond. ABU= 10 h for the day.

Shift Reports

Reports

Issues

Pending:

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)
  • Trigger fine tuning Thursday? (A. Somov)

Friday January 27

Past 24 hours

  • Production on diamond. ABU= xx h for the day.

Shift Reports

Reports

Issues

Start Counter HV match test (Beni) Given the results of this test, the next step is to figure out if there is a physical rotation on the counter. DIRC SiPM Update (Justin) The inverter box was installed. However the TDC scaler still shows zero occupancy in channel 30 of slot 8.

Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done last Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period.Talked to the PD, he will keep in contact with us on how to proceed.

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)