Difference between revisions of "Run Planning Meeting Notes, January 26 - February 1, 2023"

From GlueXWiki
Jump to: navigation, search
(Shift Reports)
m
Line 176: Line 176:
 
* [https://logbooks.jlab.org/entry/4118950 TPOL channel 23 missing (Justin)] [https://logbooks.jlab.org/entry/4119302 TPOL occupancy hole (Hovanes)][http://meson.hldsite.com/presentations/TPOL/hardwareMay2022-V2.pdf TPOL Presentation (Michael Dugger)] We could check it on Wednesday during maintenance <!-- Who?-->
 
* [https://logbooks.jlab.org/entry/4118950 TPOL channel 23 missing (Justin)] [https://logbooks.jlab.org/entry/4119302 TPOL occupancy hole (Hovanes)][http://meson.hldsite.com/presentations/TPOL/hardwareMay2022-V2.pdf TPOL Presentation (Michael Dugger)] We could check it on Wednesday during maintenance <!-- Who?-->
 
* [https://logbooks.jlab.org/entry/4119949 TAGH alarming channels: bad board ?  (Hovanes)]We have a spare. It can be changed on Wednesday
 
* [https://logbooks.jlab.org/entry/4119949 TAGH alarming channels: bad board ?  (Hovanes)]We have a spare. It can be changed on Wednesday
 +
 +
Pending:
 +
* BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.
 +
 +
=== Plans ===
 +
 +
* Production (300 nA, 2h runs) with cycle:
 +
**2 runs para(0/90)
 +
**2 runs perp(0/90)
 +
**2 runs para(45/135)
 +
**2 runs perp(45/135)
 +
**1 run amo (use it to rejuvenate amo reference in CBREM GUI)
 +
 +
= Wednesday February 1 =
 +
=== Past 24 hours ===
 +
* Production on diamond. ABU= 9.4 h for the day.
 +
 +
=== Shift Reports ===
 +
* [https://logbooks.jlab.org/entry/ Day shift summary]
 +
* [https://logbooks.jlab.org/entry/ Swing shift summary]
 +
* [https://logbooks.jlab.org/entry/ Owl shift summary]
 +
* [https://logbooks.jlab.org/entry/ Early Riser shift summary]
 +
 +
=== Reports ===
 +
* MCC is scheduling maintenance tomorrow during MCC Day shift. Requested Controlled Access
 +
* Preparations for task 9 of Run Plan. MCC requested a follow up email with a detail explanation of the plan. Paul Vasilauski mentiond that "Ops current trigger point is >2 &mu;A to HallD to require RadCon involvement "
 +
* Trigger studies (A. Somov)
 +
* Since Beni saw yesterday the TPOL channel 23, we do not need to check it out today
 +
 +
*GlueX Statistics
 +
**PARA 0/90: 14%
 +
**PERP 0/90: 14%
 +
**PARA 45/135: 17%
 +
**PERP 45/135: 14%
 +
**AMO : 40%
 +
 +
=== Issues ===
 +
* [https://logbooks.jlab.org/entry/4117764 Start Counter (Beni)] We want to confirm that the cables are in the right location. On Wednesday we can take a look at them.
 +
* [https://logbooks.jlab.org/entry/4119949 TAGH alarming channels: bad board ?  (Hovanes)] We have a spare that Boris will change today.
  
 
Pending:
 
Pending:

Revision as of 08:28, 1 February 2023

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count

Thursday January 26

Past 24 hours

  • Production on diamond. ABU= 10 h for the day.

Shift Reports

Reports

Issues

Pending:

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)
  • Trigger fine tuning Thursday? (A. Somov)

Friday January 27

Past 24 hours

  • Production on diamond. ABU= 1.3 h for the day.

Shift Reports

Reports

Issues


Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done last Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.

Plans

  • Harp scan once beam returns. Then continue cycle.
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)

Monday January 30

Past 72 hours

  • Production on diamond. ABU= 44.5 h for the weekend. (15.7 h Friday , 17.1 h Saturday, 11.7 Sunday)

Shift Reports Friday

Shift Reports Saturday

Shift Reports Sunday

Reports

  • GlueX Statistics
    • PARA 0/90: 12%
    • PERP 0/90: 15%
    • PARA 45/135: 14%
    • PERP 45/135: 12%
    • AMO : 44%

Issues

Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done last Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.

Plans

  • Opportunistic access to reset tagger (To be confirmed after morning meetings)
  • Harp scan after beam is restored
  • Sasha will perform trigger studies in the 10pm - 4am shift.
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135) -> at least 1 extra run to catch up (~.6B triggers down) [corrected]
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)

Tuesday January 31

Past 24 hours

  • Production on diamond. ABU= 9.4 h for the day.

Shift Reports

Reports

  • GlueX Statistics
    • PARA 0/90: 13%
    • PERP 0/90: 14%
    • PARA 45/135: 16%
    • PERP 45/135: 14%
    • AMO : 43%

Issues

Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)

Wednesday February 1

Past 24 hours

  • Production on diamond. ABU= 9.4 h for the day.

Shift Reports

Reports

  • MCC is scheduling maintenance tomorrow during MCC Day shift. Requested Controlled Access
  • Preparations for task 9 of Run Plan. MCC requested a follow up email with a detail explanation of the plan. Paul Vasilauski mentiond that "Ops current trigger point is >2 μA to HallD to require RadCon involvement "
  • Trigger studies (A. Somov)
  • Since Beni saw yesterday the TPOL channel 23, we do not need to check it out today
  • GlueX Statistics
    • PARA 0/90: 14%
    • PERP 0/90: 14%
    • PARA 45/135: 17%
    • PERP 45/135: 14%
    • AMO : 40%

Issues

Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)