Difference between revisions of "Run Planning Meeting Notes, January 26 - February 1, 2023"

From GlueXWiki
Jump to: navigation, search
m (Issues)
(Issues)
Line 19: Line 19:
 
**Tentative plan of action: To turn off the low voltage to the SiPM bias for a few specific start counter paddles and take a 1-hour run where we can identify the physical location of these paddles using the tracking detectors.  
 
**Tentative plan of action: To turn off the low voltage to the SiPM bias for a few specific start counter paddles and take a 1-hour run where we can identify the physical location of these paddles using the tracking detectors.  
 
* [https://logbooks.jlab.org/entry/4116427 DIRC LED TDC missing (David Lawrence, Justin] [https://logbooks.jlab.org/entry/4117275 DIRC SiPM reference signal (Justin)]
 
* [https://logbooks.jlab.org/entry/4116427 DIRC LED TDC missing (David Lawrence, Justin] [https://logbooks.jlab.org/entry/4117275 DIRC SiPM reference signal (Justin)]
**Tentative plan of action: Since no spare inverter box is available, Chris Stanislav will investigate if a simple box can be built.
+
**Tentative plan of action: Chris Stanislav will have a spare this afternoon and Justin will install during an opportunistic access
 
* [https://logbooks.jlab.org/entry/4117582 Fixing FCAL Bases Lockup (Jon)]
 
* [https://logbooks.jlab.org/entry/4117582 Fixing FCAL Bases Lockup (Jon)]
 
* [https://logbooks.jlab.org/entry/4117642 Beam Downtime Re-steering Arcs] This might need a while to be fixed. They are hoping this fixes some issues they have been seeing in the past few days.
 
* [https://logbooks.jlab.org/entry/4117642 Beam Downtime Re-steering Arcs] This might need a while to be fixed. They are hoping this fixes some issues they have been seeing in the past few days.
* [https://logbooks.jlab.org/entry/4117667 TPOL GAP (Beni)]
+
* [https://logbooks.jlab.org/entry/4117667 TPOL GAP (Beni)]: this is a translation table issue (Justin)
  
 
Pending:
 
Pending:

Revision as of 09:40, 26 January 2023

Thursday January 26

Past 24 hours

  • Production on diamond. ABU= 10 h for the day.

Shift Reports

Reports

Issues

Pending:

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)
  • Trigger fine tuning Thursday? (A. Somov)