=== Plans ===
 
=== Plans ===
 +
*Harp scan once beam returns. Then continue cycle.
 
* Production (300 nA, 2h runs) with cycle:
 
* Production (300 nA, 2h runs) with cycle:
 
**2 runs para(0/90)
 
**2 runs para(0/90)

Revision as of 16:37, 26 January 2023

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Thursday January 26

Past 24 hours

  • Production on diamond. ABU= 10 h for the day.

Shift Reports

Reports

Issues

Pending:

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)
  • Trigger fine tuning Thursday? (A. Somov)

Friday January 27

Past 24 hours

  • Production on diamond. ABU= xx h for the day.

Shift Reports

Reports

Issues

Start Counter HV match test (Beni) Given the results of this test, the next step is to figure out if there is a physical rotation on the counter. DIRC SiPM Update (Justin) The inverter box was installed. However the TDC scaler still shows zero occupancy in channel 30 of slot 8.

Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done last Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period.Talked to the PD, he will keep in contact with us on how to proceed.

Plans

  • Harp scan once beam returns. Then continue cycle.
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)