Run Planning Meeting Notes, January 26 - February 1, 2023

From GlueXWiki
Revision as of 16:38, 26 January 2023 by Ebarriga (Talk | contribs) (Issues)

Jump to: navigation, search

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Thursday January 26

Past 24 hours

  • Production on diamond. ABU= 10 h for the day.

Shift Reports

Reports

Issues

Pending:

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)
  • Trigger fine tuning Thursday? (A. Somov)

Friday January 27

Past 24 hours

  • Production on diamond. ABU= xx h for the day.

Shift Reports

Reports

Issues

Start Counter HV match test (Beni) Given the results of this test, the next step is to figure out if there is a physical rotation on the counter.

DIRC SiPM Update (Justin) The inverter box was installed. However the TDC scaler still shows zero occupancy in channel 30 of slot 8.

The left Ar gas supply bank is empty

Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done last Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period.Talked to the PD, he will keep in contact with us on how to proceed.

Plans

  • Harp scan once beam returns. Then continue cycle.
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)