Run Planning Meeting Notes, January 26 - February 1, 2023

From GlueXWiki
Revision as of 09:32, 31 January 2023 by Churaman (Talk | contribs) (Shift Reports)

Jump to: navigation, search

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count

Thursday January 26

Past 24 hours

  • Production on diamond. ABU= 10 h for the day.

Shift Reports

Reports

Issues

Pending:

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)
  • Trigger fine tuning Thursday? (A. Somov)

Friday January 27

Past 24 hours

  • Production on diamond. ABU= 1.3 h for the day.

Shift Reports

Reports

Issues


Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done last Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.

Plans

  • Harp scan once beam returns. Then continue cycle.
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)

Monday January 30

Past 72 hours

  • Production on diamond. ABU= 44.5 h for the weekend. (15.7 h Friday , 17.1 h Saturday, 11.7 Sunday)

Shift Reports Friday

Shift Reports Saturday

Shift Reports Sunday

Reports

  • GlueX Statistics
    • PARA 0/90: 12%
    • PERP 0/90: 15%
    • PARA 45/135: 14%
    • PERP 45/135: 12%
    • AMO : 44%

Issues

Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done last Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.

Plans

  • Opportunistic access to reset tagger (To be confirmed after morning meetings)
  • Harp scan after beam is restored
  • Sasha will perform trigger studies in the 10pm - 4am shift.
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135) -> at least 1 extra run to catch up (~.6B triggers down) [corrected]
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)

Tuesday January 31

Past 24 hours

  • Production on diamond. ABU= 9.4 h for the day.

Shift Reports

Reports

  • GlueX Statistics
    • PARA 0/90: 13%
    • PERP 0/90: 14%
    • PARA 45/135: 16%
    • PERP 45/135: 14%
    • AMO : 43%

Issues

Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)