Difference between revisions of "Run Planning Meeting Notes, July 07 - July 14, 2022"

From GlueXWiki
Jump to: navigation, search
(Shift reports)
(Reports)
Line 30: Line 30:
 
=== Reports ===
 
=== Reports ===
  
* Sergey and Lubomir worked in the Hall this night around 10pm to 11:30pm [https://logbooks.jlab.org/entry/4011999]
+
* Sergey and Lubomir worked in the Hall this night from 10pm to 11:30pm [https://logbooks.jlab.org/entry/4011999]
 
* Hovanes reported his study of the coherent peak position drifts observed on 4th of July [https://logbooks.jlab.org/entry/4011805]
 
* Hovanes reported his study of the coherent peak position drifts observed on 4th of July [https://logbooks.jlab.org/entry/4011805]
  

Revision as of 23:29, 6 July 2022

Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Wednesday July 7

Past 24 hours

  • Malte and Mark worked on FCAL modules replacement [1]
  • One of the RF crates had been disconnected, Beni fixed it [2]
  • Bobby and others worked in the tagger hall during the day. At 3:30pm Bobby noticed that the IOC for the NMR was not responding properly. MCC rebooted the IOC crate. Afterwards, it was still locked on zero and there was still a Comm Status error [3]
  • Beni found that the solenoid controls hung, and restarted the ramping, which was helpful.
  • Had minor issues with DAQ at 7.00pm: ROCFDC11 error: timeout error on FA125, every 3 seconds. (fADC125 in fdc11 slot 3 was replaced during day time [4]) Sergei worked out the DAQ issue at 7.50pm
  • Established operating field of solenoid at 8:30pm.
  • production data taking continued on Pb

Shift reports

Reports

  • Sergey and Lubomir worked in the Hall this night from 10pm to 11:30pm [5]
  • Hovanes reported his study of the coherent peak position drifts observed on 4th of July [6]

Issues

  • Hovanes pointed out that something strange happened during solenoid ramping up [7]

Plans

  • Continue production on lead
  • Unmasking FCAL central modules from the trigger needs to be done unless if increases rate too high