Line 14: Line 14:
  
  
* Malte and Mark worked on FCAL modules replacement [https://logbooks.jlab.org/entry/4011757]
+
* Malte and Mark worked on FCAL bases replacement [https://logbooks.jlab.org/entry/4011757]
 
* One of the RF crates had been disconnected, Beni fixed it [https://logbooks.jlab.org/entry/4011767]
 
* One of the RF crates had been disconnected, Beni fixed it [https://logbooks.jlab.org/entry/4011767]
 
* Bobby and others worked in the tagger hall during the day. At 3:30 pm Bobby noticed that the IOC for the NMR was not responding properly. MCC rebooted the IOC crate. Afterward, it was still locked on zero and there was still a Comm Status error [https://logbooks.jlab.org/entry/4011870]
 
* Bobby and others worked in the tagger hall during the day. At 3:30 pm Bobby noticed that the IOC for the NMR was not responding properly. MCC rebooted the IOC crate. Afterward, it was still locked on zero and there was still a Comm Status error [https://logbooks.jlab.org/entry/4011870]

Revision as of 08:42, 7 July 2022

Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Wednesday July 7

Past 24 hours

  • Malte and Mark worked on FCAL bases replacement [1]
  • One of the RF crates had been disconnected, Beni fixed it [2]
  • Bobby and others worked in the tagger hall during the day. At 3:30 pm Bobby noticed that the IOC for the NMR was not responding properly. MCC rebooted the IOC crate. Afterward, it was still locked on zero and there was still a Comm Status error [3]
  • Beni found that the solenoid controls hung, and restarted the ramping, which was helpful.
  • Had minor issues with DAQ at 7.00 pm: ROCFDC11 error: timeout error on FA125, every 3 seconds. (fADC125 in fdc11 slot 3 was replaced during daytime [4]) Sergei worked out the DAQ issue at 7.50 pm
  • Established operating field of the solenoid at 8:30 pm.
  • harp scans are ongoing now

Shift reports

Reports

  • Sergey and Lubomir worked in the Hall this night from 10 pm to 11:30 pm [5]
  • Hovanes reported his study of the coherent peak position drifts observed on the 4th of July [6]
  • Still have 60Hz structure [7]. The situation is improved according to MCC experts.
  • CDC HV and TAGM alarms are more frequent now
  • CDC gas flow increased [8]

Issues

  • Hovanes pointed out that something strange happened during solenoid ramping up [9] [10]

Plans

  • Continue production on lead
  • Unmasking FCAL central modules from the trigger needs to be done unless it increases rate too high