= Thursday July 8 =
 +
 +
=== Past 24 hours ===
 +
 +
* harp scans were done during short beam on period during day-time, some distributions show 1/100 peak/shoulders ratio others 1/10,000 [https://logbooks.jlab.org/entry/4012157] [https://logbooks.jlab.org/entry/4012169]
 +
* Dominion Power's work required a voltage reduction so we had tagger, PS and sweep magnets off for a couple of hours
 +
* collected cosmics and LED runs during daytime, and production on lead (about 8 hrs) during night time
 +
 +
=== Shift reports ===
 +
* [https://logbooks.jlab.org/entry/4012170 day shift summary]
 +
* [https://logbooks.jlab.org/entry/4012365 swing shift summary]
 +
* [https://logbooks.jlab.org/entry/4012468 owl shift summary]
 +
* [https://logbooks.jlab.org/entry/4012564 early riser shift summary]
 +
 +
=== Reports ===
 +
* Sasha checked FCAL trigger rate without masking inner layers. Preliminary result for the rate was  14kHz [https://logbooks.jlab.org/entry/4012436]
 +
 +
=== Issues ===
 +
* Problems with running at 60nA on AMO, radiator thickness was reduced to 3*10^-4 this night,
 +
as 4.5*10^-4 was causing IOC trips [https://logbooks.jlab.org/entry/4012504]
 +
* DIRC major alarm has been acknowledged [https://logbooks.jlab.org/entry/4012485], Mark may need to investigate this issue more
 +
* Dave has noticed we have a higher radiation level values now, about factor of 1.5 [https://logbooks.jlab.org/entry/4012423], [https://logbooks.jlab.org/entry/4012426]
 +
* Hydra alarm on fa125_itrig [https://logbooks.jlab.org/entry/4012288]
 +
* daq livetime is uneven from time to time [https://logbooks.jlab.org/entry/4012631]
 +
 +
=== Plans ===
 +
* Continue production on lead
 +
* Unmasking FCAL modules
 +
  
 
= Wednesday July 7 =
 
= Wednesday July 7 =

Revision as of 08:28, 8 July 2022

Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Thursday July 8

Past 24 hours

  • harp scans were done during short beam on period during day-time, some distributions show 1/100 peak/shoulders ratio others 1/10,000 [1] [2]
  • Dominion Power's work required a voltage reduction so we had tagger, PS and sweep magnets off for a couple of hours
  • collected cosmics and LED runs during daytime, and production on lead (about 8 hrs) during night time

Shift reports

Reports

  • Sasha checked FCAL trigger rate without masking inner layers. Preliminary result for the rate was 14kHz [3]

Issues

  • Problems with running at 60nA on AMO, radiator thickness was reduced to 3*10^-4 this night,

as 4.5*10^-4 was causing IOC trips [4]

  • DIRC major alarm has been acknowledged [5], Mark may need to investigate this issue more
  • Dave has noticed we have a higher radiation level values now, about factor of 1.5 [6], [7]
  • Hydra alarm on fa125_itrig [8]
  • daq livetime is uneven from time to time [9]

Plans

  • Continue production on lead
  • Unmasking FCAL modules


Wednesday July 7

Past 24 hours

  • Malte and Mark worked on FCAL bases replacement [10]
  • One of the RF crates had been disconnected, Beni fixed it [11]
  • Bobby and others worked in the tagger hall during the day. At 3:30 pm Bobby noticed that the IOC for the NMR was not responding properly. MCC rebooted the IOC crate. Afterward, it was still locked on zero and there was still a Comm Status error [12]
  • Beni found that the solenoid controls hung, and restarted the ramping, which was helpful.
  • Had minor issues with DAQ at 7.00 pm: ROCFDC11 error: timeout error on FA125, every 3 seconds. (fADC125 in fdc11 slot 3 was replaced during daytime [13]) Sergei worked out the DAQ issue at 7.50 pm
  • Established operating field of the solenoid at 8:30 pm.
  • harp scans are ongoing now

Shift reports

Reports

  • Sergey and Lubomir worked in the Hall this night from 10 pm to 11:30 pm [14]
  • Hovanes reported his study of the coherent peak position drifts observed on the 4th of July [15]
  • Still have 60Hz structure [16]. The situation is improved according to MCC experts.
  • CDC HV and TAGM alarms are more frequent now
  • CDC gas flow increased [17]

Issues

  • Hovanes pointed out that something strange happened during solenoid ramping up [18] [19]

Plans

  • Continue production on lead
  • Unmasking FCAL central modules from the trigger needs to be done unless it increases rate too high