Difference between revisions of "Run Planning Meeting Notes, July 14 - July 20, 2022"

From GlueXWiki
Jump to: navigation, search
(Thursday July 14)
(Reports)
Line 23: Line 23:
  
 
=== Reports ===
 
=== Reports ===
* Trigger has been modified [https://logbooks.jlab.org/entry/4014639]
+
* [https://logbooks.jlab.org/entry/4014847 Install Empty Target]
* Scans (7.30 pm [https://logbooks.jlab.org/entry/4014607], 9 pm [https://logbooks.jlab.org/entry/4014628])
+
* Collimator scan (Hovanes)[https://logbooks.jlab.org/entry/4014610] (result [https://logbooks.jlab.org/entry/4014619], xtrapolation [https://logbooks.jlab.org/entry/4014657]); MWPC was tripping(?)
+
* Beam asym. monitor. fixed [https://logbooks.jlab.org/entry/4014793]
+
* Slight improvement in Y-position stability [logentry from Matt Mock https://logbooks.jlab.org/entry/4014665]
+
* Night beam strip chart [https://logbooks.jlab.org/entry/4014730]
+
  
 
=== Issues ===
 
=== Issues ===

Revision as of 19:48, 13 July 2022

Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs


Thursday July 14

Past 24 hours

  • Production on lead (~2.7B events)
  • trigger changed around 10 pm, first run with the updated trigger 101033

Shift Reports

Reports

Issues

Plans

  • Switch to empty target this afternoon
  • RF Recovery Thursday (beam down 8.15 till ~5pm)