Difference between revisions of "Run Planning Meeting Notes, July 21- July 27, 2022"

From GlueXWiki
Jump to: navigation, search
(Reports)
Line 8: Line 8:
  
 
[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs]
 
[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs]
 +
 +
= Monday July 25 =
 +
 +
=== Past 24 hours ===
 +
* Data taking on empty target, approx xyz B triggers in the past 24 hours
 +
 +
=== Shift Reports ===
 +
* [https://logbooks.jlab.org/entry/4019028 Day shift summary ]
 +
* [https://logbooks.jlab.org/entry/4019130 Swing shift summary]
 +
* [https://logbooks.jlab.org/entry/4019206 Owl shift summary]
 +
* [https://logbooks.jlab.org/entry/4019275 Early Riser shift summary]
 +
 +
=== Reports ===
 +
 +
* [https://logbooks.jlab.org/entry/4019114 3 bases and 1 PMT swapped in FCAL] Mark
 +
* [https://logbooks.jlab.org/entry/4019308 Discriminator problem in rocTAGH2 slot 18] Hovannes
 +
* [https://logbooks.jlab.org/entry/4019304 Tagger hodoscope scalar channels frozen] Thomas
 +
 +
=== Plans ===
 +
* Switch to full target running after the RC meeting
 +
  
 
= Sunday July 24 =
 
= Sunday July 24 =

Revision as of 16:13, 24 July 2022

Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Monday July 25

Past 24 hours

  • Data taking on empty target, approx xyz B triggers in the past 24 hours

Shift Reports

Reports

Plans

  • Switch to full target running after the RC meeting


Sunday July 24

Past 24 hours

  • Data taking on empty target, approx 2.8 B triggers in the past 24 hours

Shift Reports

Reports

Plans

  • Continue taking data on empty target until Monday morning.

Saturday July 23

Past 24 hours

  • Data taking on empty target, approx 2.7 B triggers in the past 24 hours

Shift Reports

Reports

Plans

  • In discussions Friday after the RC meeting it was decided to continue data taking on empty target until Monday morning. Then switch to full target.

Friday July 22

Past 24 hours

  • Data taking on empty target, approx 2.1 B triggers in the past 24 hours
  • Priority for beam delivery shifts to Hall D today

Shift Reports

Reports

Plans

  • Continue data taking on empty target until ~ 17:00 today, then switch to full target for running over the weekend

Thursday July 21

Past 24 hours

  • ROCFDC11 Slot 19 FADC125 (possibly?) repaired
  • Solenoid final ramp to 1350 A ~ 5:00 AM
  • Beam returns ~ 5:00 AM
  • Harp scans
  • Start data taking on empty target ~ 6:00 AM

Shift Reports

Reports

Plans

  • Continue data taking on empty target