Line 9: Line 9:
 
[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs]
 
[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs]
  
= Wednesday July 20 =
+
= Wednesday July 27 =
  
=== Past 24 hours ===
+
=== Past 24 hours ===  
 
+
* The accelerator went offline at 5:30 PM Tuesday due to a power glitch to CEBAF. The Tagger and PS magnets tripped off. Waiting for issues with a RF zone and a bulk power supply to be resolved
* [https://logbooks.jlab.org/entry/4017435 FCAL FADC250 replaced]
+
* Data taking on Pb target, approx 1.0 B triggers in the past 24 hours
* [https://logbooks.jlab.org/entry/4017475 Changed to Empty Target] (Ilya)
+
* Production on Empty Target 60 nA (~0.4 B events)
+
* Evening showers dropped beam about 7 pm. Arc 3 Power Supply died (in service building that overheated this weekend)
+
* [https://logbooks.jlab.org/entry/4017706 1 am: No beam for the night]
+
* [https://logbooks.jlab.org/entry/4017730 Solenoid ramp down started] (Tim)
+
* [https://logbooks.jlab.org/entry/4017747 Accelerator Maintenance Day]. Swap in spare box supply ~ 8 hrs.
+
  
 
=== Shift Reports ===
 
=== Shift Reports ===
* [https://logbooks.jlab.org/entry/4017431 Day shift summary]  
+
* [https://logbooks.jlab.org/entry/4020157 Day shift summary ]
* [https://logbooks.jlab.org/entry/4017575 Swing shift summary]
+
* [https://logbooks.jlab.org/entry/4020263 Swing shift summary]
* [https://logbooks.jlab.org/entry/4017671 Owl shift summary]
+
* [https://logbooks.jlab.org/entry/4020412 Owl shift summary]
* [https://logbooks.jlab.org/entry/4017723 Early Riser shift summary]
+
* [https://logbooks.jlab.org/entry/4020460 Early Riser shift summary]
  
 
=== Reports ===
 
=== Reports ===
* [https://logbooks.jlab.org/entry/4017400 FCAL Flash250 Replaced] (Karthik).  Thanks to Chris Stanislav, Sergey and Mark Dalton for fixing the problem.
 
* [https://logbooks.jlab.org/entry/4017369 Translation Table rocfdc11 slot 3->19] (Justin)
 
* [https://logbooks.jlab.org/entry/4017533 Update on pi0 peak] (Beni)
 
* [https://logbooks.jlab.org/entry/4017550 Trigger rates with empty target] (Yannic)
 
* [https://logbooks.jlab.org/entry/4017767 Trigger with missing FCAL module] (Sasha)
 
  
=== Issues and Features ===
+
* [https://logbooks.jlab.org/entry/4019951 CDC HV trip] Hovannes
* Add the TOF and CTOF trigger rates to EPICs/archiver
+
* [https://logbooks.jlab.org/entry/4017357 Tagger Hodoscope channels turned off]
+
* [https://logbooks.jlab.org/entry/4017713 FMWPC gas low], [https://logbooks.jlab.org/entry/4017721 gas changed out], [https://logbooks.jlab.org/entry/4017733 status], [https://logbooks.jlab.org/entry/4017742 bottles changed out]
+
  
 
=== Plans ===
 
=== Plans ===
 +
* When beam returns take harp scans, then resume data taking on Pb full target
 +
* Thursday day shift is scheduled for beam studies, beam in the accelerator but not to the halls.  This would be a good time to work on the CTOF PMT#3
  
* Accelerator maintenance day.
+
= Tuesday July 26 =
** Ramp down solenoid to 0 A to do cryogenic maintenance. (Tim coordinating with Jonathan Creel)
+
** Investigation of ROCFDC11 Slot 19 FADC125?
+
** Investigate FMWPC gas supply?
+
** [https://logbooks.jlab.org/entry/4017006 FCAL bases maintenance]
+
** [https://mailman.jlab.org/pipermail/halld/2022-July/000996.html Safety Walkthrough at 12:30 pm]. Sign up.
+
** Take Harp Scans. Solenoid should be back 7-8 pm.
+
** Continue running with Empty Target
+
  
= Tuesday July 19 =
+
=== Past 24 hours ===  
 
+
* Switched to Pb target around 10:30 AM Monday
=== Past 24 hours ===
+
* Data taking on Pb target, approx 2.8 B triggers in the past 24 hours
 
+
* Production on Full Pb target 30 nA (~2.8 B events)
+
* At noon ROCFDC11 Slot 19 failed to respond and Sergey took the module out of the configuration. A hall access was not able to fix the problem. (Issue is ongoing)
+
* At about 2 am, Flas250 module in FCAL died. Chris Stanislav replaced it at about 7:30 this morning. Sergey is getting DAQ back up.
+
* [https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard] - Maintenance Day on Wednesday
+
  
 
=== Shift Reports ===
 
=== Shift Reports ===
* [https://logbooks.jlab.org/entry/4016998 Day shift summary]  
+
* [https://logbooks.jlab.org/entry/4019718 Day shift summary ]
* [https://logbooks.jlab.org/entry/4017085 Swing shift summary]
+
* [https://logbooks.jlab.org/entry/4019819 Swing shift summary]
* [https://logbooks.jlab.org/entry/4017205 Owl shift summary]
+
* [https://logbooks.jlab.org/entry/4019921 Owl shift summary]
* [https://logbooks.jlab.org/entry/4017283 Early Riser shift summary]
+
* [https://logbooks.jlab.org/entry/4020034 Early Riser shift summary]
  
 
=== Reports ===
 
=== Reports ===
* [https://logbooks.jlab.org/entry/4016986 Web browser with hodps]
 
* [https://logbooks.jlab.org/entry/4017188 Reconstruction observations] (Sean)
 
  
=== Issues and Features ===
+
* [https://logbooks.jlab.org/entry/4019750 Lead target installed] Ilya
* Add the TOF and CTOF trigger rates to EPICs/archiver
+
* [https://logbooks.jlab.org/entry/4019951 Occasional CDC HV trips]
* [https://logbooks.jlab.org/entry/4012390 Translation table for rocfdc11] (Justin)
+
* ROCFDC11 FADC125 slot19 problems (Sergey)
+
* [https://logbooks.jlab.org/entry/4017263 FCAL FADC250 board died]
+
* [https://logbooks.jlab.org/entry/4017266 Example monitoring plots] Physics distributions may be compromised.
+
  
 
=== Plans ===
 
=== Plans ===
 +
* Continue taking data on full target
 +
* Next opportunity to repair CTOF PMT #3 is probably Thursday, tentative RF recovery day
  
* Production data on Full Pb target
+
= Monday July 25 =
* Accelerator will do a 1 hr test plan at 10 am.
+
* Change to Empty Target
+
* Tomorrow:
+
** Safety Walkthrough at 12:30 pm
+
** Investigation of ROCFDC11 Slot 19 FADC125?
+
** Possible ramp down of solenoid to 800 A to do cryogenic maintenance.
+
  
= Monday July 18 =
+
=== Past 24 hours ===  
 
+
* Data taking on empty target, approx 2.7 B triggers in the past 24 hours
=== Past 24 hours ===
+
 
+
* Production on Full Pb target 30 nA (~3.B events)
+
* Hall C now running at 65 uA. Total beam trips 16/hr, RF trips 10/hr, which is fairly good.
+
* [https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard] - Maintenance Day on Wednesday
+
* Doug: Request for schedule update is in progress. Official approval underway; no issues expected.
+
  
 
=== Shift Reports ===
 
=== Shift Reports ===
* [https://logbooks.jlab.org/entry/4016647 Day shift summary]  
+
* [https://logbooks.jlab.org/entry/4019380 Day shift summary ]
* [https://logbooks.jlab.org/entry/4016734 Swing shift summary]
+
* [https://logbooks.jlab.org/entry/4019457 Swing shift summary]
* [https://logbooks.jlab.org/entry/4016802 Owl shift summary]
+
* [https://logbooks.jlab.org/entry/4019548 Owl shift summary]
* [https://logbooks.jlab.org/entry/4016872 Early Riser shift summary]
+
* [https://logbooks.jlab.org/entry/4019620 Early Riser shift summary]
 
+
=== (Proposed) Guidelines ===
+
* Half-wave plate changes: End the current run. Make a separate log entry indicating new position of HWP (in/out). Start a new run
+
* Day shift: Check FMWPC gas pressure. Make a separate log entry with current pressure.
+
  
 
=== Reports ===
 
=== Reports ===
* [https://logbooks.jlab.org/entry/4016676 Current Statistics for CPP-NPP Run] (Albert)
 
* [https://logbooks.jlab.org/entry/4016924 Beam position stability on AC] (Beni)
 
* [https://logbooks.jlab.org/entry/4016671 pi0 update] (Beni)
 
* [https://logbooks.jlab.org/entry/4016921 Rate monitoring] (Alexandre)
 
* [https://logbooks.jlab.org/entry/4016405 Last 3 fa125 itrig errors occurred at event 199961.  Go figure.] (Naomi)
 
  
=== Issues and Features ===
+
* [https://logbooks.jlab.org/entry/4019447 Some TagH scalars are high with no beam] A. Hurley
* Stability of beam position at Active Collimator
+
* [https://logbooks.jlab.org/entry/4019388 Nice clean omega] Beni
* Add the TOF and CTOF trigger rates to EPICs/archiver
+
* [https://logbooks.jlab.org/entry/4016899 DAQ windows not updating until window is selected]
+
* [https://logbooks.jlab.org/entry/4016770 FCAL Base lockup]
+
* [https://logbooks.jlab.org/entry/4012390 Translation table for rocfdc11] (Justin)
+
  
 
=== Plans ===
 
=== Plans ===
 +
* Switch to full target running after the RC meeting
  
* Production data on Full Pb target
 
* Decide when to go to Empty Target
 
  
= Sunday July 17 =
+
= Sunday July 24 =
  
=== Past 24 hours ===
+
=== Past 24 hours ===  
 
+
* Data taking on empty target, approx 2.8 B triggers in the past 24 hours
* Production on Full Pb target 30 nA (~2.B events)
+
* Hall C is now running at 65 uA.
+
* Accelerator problems in the evening
+
** Evening temperatures impacted cooling in building #38 (South Linac - east end). Supplementary cooling was added and stabilized the situation, but facilities may need to help with additional cooling. The are indicators of challenges of running through the summer.
+
** Thunderstorms affect operation; root causes are not known. Possible causes (Jay): 1. u-phonics induced by the thunderstorms, C-100 cryomodules not adequately damped for 10-80 Hz vibrations, coupled to waveguides to upstairs. 2. Imperfect grounding. 3. micros electrical discharges affecting low level RF. 4. Long helix master RF cable running to south linac in water-filled trough.
+
  
 
=== Shift Reports ===
 
=== Shift Reports ===
* [https://logbooks.jlab.org/entry/4016315 Day shift summary]  
+
* [https://logbooks.jlab.org/entry/4019028 Day shift summary ]
* [https://logbooks.jlab.org/entry/4016409 Swing shift summary]
+
* [https://logbooks.jlab.org/entry/4019130 Swing shift summary]
* [https://logbooks.jlab.org/entry/4016462 Owl shift summary]
+
* [https://logbooks.jlab.org/entry/4019206 Owl shift summary]
* [https://logbooks.jlab.org/entry/4016545 Early Riser shift summary]
+
* [https://logbooks.jlab.org/entry/4019275 Early Riser shift summary]
  
 
=== Reports ===
 
=== Reports ===
* [https://logbooks.jlab.org/comment/reply/1089411 CDC pressure drifts]
 
  
=== Issues and Features ===
+
* [https://logbooks.jlab.org/entry/4019114 3 bases and 1 PMT swapped in FCAL] Mark
* Stability of beam position at Active Collimator
+
* [https://logbooks.jlab.org/entry/4019308 Discriminator problem in rocTAGH2 slot 18] Hovannes
* Add the TOF and CTOF trigger rates to EPICs/archiver
+
* [https://logbooks.jlab.org/entry/4019304 Tagger hodoscope scalar channels frozen] Thomas
* (Minor) DAQ problems Early Riser Sat, Owl Sunday
+
  
 
=== Plans ===
 
=== Plans ===
 +
* Continue taking data on empty target until Monday morning.
  
* Production data on Full Pb target
+
= Saturday July 23 =
  
= Saturday July 16 =
+
=== Past 24 hours ===  
 
+
* Data taking on empty target, approx 2.7 B triggers in the past 24 hours
=== Past 24 hours ===
+
 
+
* Production on Empty target 60 nA (~1.1 B events)
+
* Hall Access
+
** [https://logbooks.jlab.org/entry/4016008 Inserted Pb target] (Ilya)
+
** [https://logbooks.jlab.org/entry/4015979 Changed one FCAL base] (Malte/Mark)
+
** [https://logbooks.jlab.org/entry/4016032 Switched SD boards between FDC crates 11 and 12] (Cody/Ben)
+
* Harp Scans
+
** [https://logbooks.jlab.org/entry/4016065 IHA5C11]
+
** [https://logbooks.jlab.org/entry/4016066 IHA5C11B]
+
** [https://logbooks.jlab.org/entry/4016072 Goniometer]
+
** [https://gryphn.phys.uconn.edu/halld/cobrems/harptool_2d.cgi?harp5C11_xsigma=1.288&harp5C11_xsigma_err=0.03&harp5C11_usigma=0.9475&harp5C11_usigma_err=0.03&harp5C11_ysigma=0.8761&harp5C11_ysigma_err=0.03&harp5C11B_xsigma=1.048&harp5C11B_xsigma_err=0.07&harp5C11B_usigma=0.8293&harp5C11B_usigma_err=0.06&harp5C11B_ysigma=0.8473&harp5C11B_ysigma_err=0.15&radHarp_xsigma=1.075&radHarp_xsigma_err=0.02&radHarp_usigma=1.044&radHarp_usigma_err=0.02&radHarp_ysigma=0.7626&radHarp_ysigma_err=0.02&harp5C11_spos=102.97&harp5C11B_spos=115.11&emittance_x=0.0041&radHarp_spos=119.7&emittance_y=0.00233&collimator_spos=194.92&fit=fit+and+plot Extrapolation]
+
* Production on Full Pb target 30 nA (~2.1  B events)
+
  
 
=== Shift Reports ===
 
=== Shift Reports ===
* [https://logbooks.jlab.org/entry/4015852 Day shift summary]  
+
* [https://logbooks.jlab.org/entry/4018602 Day shift summary ]
* [https://logbooks.jlab.org/entry/4016029 Swing shift summary]
+
* [https://logbooks.jlab.org/entry/4018730 Swing shift summary]
* [https://logbooks.jlab.org/entry/4016155 Owl shift summary]
+
* [https://logbooks.jlab.org/entry/4018841 Owl shift summary]
* [https://logbooks.jlab.org/entry/4016232 Early Riser shift summary]
+
* [https://logbooks.jlab.org/entry/4018917 Early Riser shift summary]
  
 
=== Reports ===
 
=== Reports ===
 +
 
*
 
*
 
=== Issues and Features ===
 
 
* [https://logbooks.jlab.org/entry/4015955 FA125 itrig errors R101072], [https://logbooks.jlab.org/entry/4016032 SD cards swapped] [https://logbooks.jlab.org/entry/4016094 FA125 itrig errors R101076]
 
* Stability of beam position at Active Collimator
 
* Add the TOF and CTOF trigger rates to EPICs/archiver
 
  
 
=== Plans ===
 
=== Plans ===
 +
* In discussions Friday after the RC meeting it was decided to continue data taking on empty target until Monday morning. Then switch to full target.
  
* Production data on Full Pb target
+
= Friday July 22 =
  
= Friday July 15 =
+
=== Past 24 hours ===  
 
+
* Data taking on empty target, approx 2.1 B triggers in the past 24 hours
=== Past 24 hours ===
+
* Priority for beam delivery shifts to Hall D today
 
+
* [https://logbooks.jlab.org/entry/4015174 RF Recovery Day]
+
** Productive Recovery
+
** Slow orbit drifts investigated. Source: changing up of a screen. Longterm solution will be implemented with long shutdown, requires vacuum work. Short-term: increase apertures, possibly this weekend.
+
** Restoring to more stable configuration. Delivered 70 uA to Hall C for short period and ran 48 uA overnight.
+
** RF trips at about 13 trips/hr.
+
* Maintenance
+
** Access to investigate DIRC environment parameters (Nick)
+
** Access to install crystals for testing in the PS Test Setup (Vlad and Sasha)
+
** [https://logbooks.jlab.org/entry/4015311 DIRC Environment] (Tim)
+
** [https://logbooks.jlab.org/entry/4015417 Recycled power on BCAL LED crate] (Elton/Mark)
+
** [https://logbooks.jlab.org/entry/4015489 FCAL Base Replaced] (Malte/Mark]
+
* [https://logbooks.jlab.org/entry/4015319 Program when beam comes back]
+
* [https://logbooks.jlab.org/entry/4015508 Solenoid ramped up to 1350 A] (Tim)
+
* Beam back about 9 pm.
+
* Production on Empty target 30 nA (~0.08 B events)
+
* Production on Empty target 60 nA (~1 B events)
+
  
 
=== Shift Reports ===
 
=== Shift Reports ===
* [https://logbooks.jlab.org/entry/4015226 Day shift summary]  
+
* [https://logbooks.jlab.org/entry/4018251 Day shift summary ]
* [https://logbooks.jlab.org/entry/4015409 Swing shift summary]
+
* [https://logbooks.jlab.org/entry/4018374 Swing shift summary]
* [https://logbooks.jlab.org/entry/4015548 Owl shift summary]
+
* [https://logbooks.jlab.org/entry/4018466 Owl shift summary]
* [https://logbooks.jlab.org/entry/4015641 Early Riser shift summary]
+
* [https://logbooks.jlab.org/entry/4018525 Early Riser shift summary]
  
 
=== Reports ===
 
=== Reports ===
* [https://logbooks.jlab.org/entry/4015304 Single pi0 production] (Beni)
 
* [https://logbooks.jlab.org/entry/4015449 omega signal in FCAL] (Simon)
 
  
=== Issues and Features ===
+
* [https://logbooks.jlab.org/entry/4018249 Followup on backgrounds seen in coherent pi0 photo-production on lead]] Beni
* Stability of beam position at Active Collimator
+
* [https://logbooks.jlab.org/entry/4018256 Updated firmware for fadc250 rocfcal2, slot13]  Sasha
* [https://logbooks.jlab.org/entry/4015260 itrigger errors in monitoring plots]
+
* [https://logbooks.jlab.org/entry/4018261 FCAL Hit Local Time after the fix ]
* [https://logbooks.jlab.org/entry/4015255 Hydra not running] (Naomi)
+
* [https://logbooks.jlab.org/entry/4018258 Trigger rates with amorphous radiator and empty target] Y. Wolf
* Add the TOF and CTOF trigger rates to EPICs/archiver
+
* [https://logbooks.jlab.org/entry/4018405 TOF and CTOF trigger rates recorded to EPICS] Sasha
 +
* [https://logbooks.jlab.org/entry/4018538 CTOF paddle 3 PMT tripped] David L.
  
 
=== Plans ===
 
=== Plans ===
* Need about 6 hours to complete present cycle on empty target.
+
* Continue data taking on empty target until ~ 17:00 today, then switch to full target for running over the weekend
* Insert Full Target Pb  (mid afternoon)
+
* Change SD card in FDC crate if Cody is available.
+
* Harp scans
+
* Production
+
  
 
= Thursday July 21 =
 
= Thursday July 21 =
  
 
=== Past 24 hours ===  
 
=== Past 24 hours ===  
* Production on empty target (~xyz B events)
+
* ROCFDC11 Slot 19 FADC125 (possibly?) repaired
 +
* Solenoid final ramp to 1350 A ~ 5:00 AM
 +
* Beam returns ~ 5:00 AM
 +
* Harp scans
 +
* Start data taking on empty target ~ 6:00 AM
  
 
=== Shift Reports ===
 
=== Shift Reports ===
 +
* [https://logbooks.jlab.org/entry/4017818 Day shift summary ]
 
* [https://logbooks.jlab.org/entry/4017969 Swing shift summary]
 
* [https://logbooks.jlab.org/entry/4017969 Swing shift summary]
* [https://logbooks.jlab.org/entry/4015049 Owl shift summary]
+
* [https://logbooks.jlab.org/entry/4018466 Owl shift summary]
* [https://logbooks.jlab.org/entry/4015132 Early Riser shift summary]
+
* [https://logbooks.jlab.org/entry/4018097 Early Riser shift summary]
  
 
=== Reports ===
 
=== Reports ===
 
* [https://logbooks.jlab.org/entry/4017837 see etas] Beni
 
* [https://logbooks.jlab.org/entry/4017837 see etas] Beni
 +
* [https://logbooks.jlab.org/entry/4017922 7 FCAL bases changed] Mark
 +
* [https://logbooks.jlab.org/entry/4017886 Changed CPP chamber gas flow] Tim
 +
* [https://logbooks.jlab.org/entry/4017940 HD solenoid update ] Tim
 +
* [https://logbooks.jlab.org/entry/4017987 Strange solenoid MPS GUI state ] Hovannes
 +
* [https://logbooks.jlab.org/entry/4018099 Solenoid final ramp to 1350 A ] Tim
 +
* [https://logbooks.jlab.org/entry/4018108 Harp scan 5C11]
 +
* [https://logbooks.jlab.org/entry/4018110 Harp scan 5C11B]
 +
* [https://logbooks.jlab.org/entry/4018124 Radiator wire scan ] Hovannes
 +
* [https://gryphn.phys.uconn.edu/halld/cobrems/harptool_2d.cgi?harp5C11_xsigma=1.281&harp5C11_xsigma_err=0.03&harp5C11_usigma=0.8745&harp5C11_usigma_err=0.03&harp5C11_ysigma=0.6953&harp5C11_ysigma_err=0.03&harp5C11B_xsigma=1.021&harp5C11B_xsigma_err=0.05&harp5C11B_usigma=0.8057&harp5C11B_usigma_err=0.05&harp5C11B_ysigma=0.6756&harp5C11B_ysigma_err=0.15&radHarp_xsigma=0.982&radHarp_xsigma_err=0.02&radHarp_usigma=0.8169&radHarp_usigma_err=0.02&radHarp_ysigma=0.6105&radHarp_ysigma_err=0.02&harp5C11_spos=102.97&harp5C11B_spos=115.11&emittance_x=0.0041&radHarp_spos=119.7&emittance_y=0.00233&collimator_spos=194.92&fit=fit+and+plot Extrapolations from today’s wire scans] Hovannes
 +
* [https://logbooks.jlab.org/entry/4018146 FCAL hit local time looks weird] Ksuresh
 +
* [https://logbooks.jlab.org/entry/4018153 Trigger plots for the run don’t match reference ] Ksuresh
 +
* [https://logbooks.jlab.org/entry/4018163 BCAL hot channel?] Ksuresh
  
 
=== Plans ===
 
=== Plans ===
 
* Continue data taking on empty target
 
* Continue data taking on empty target

Latest revision as of 08:17, 27 July 2022

Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Wednesday July 27

Past 24 hours

  • The accelerator went offline at 5:30 PM Tuesday due to a power glitch to CEBAF. The Tagger and PS magnets tripped off. Waiting for issues with a RF zone and a bulk power supply to be resolved
  • Data taking on Pb target, approx 1.0 B triggers in the past 24 hours

Shift Reports

Reports

Plans

  • When beam returns take harp scans, then resume data taking on Pb full target
  • Thursday day shift is scheduled for beam studies, beam in the accelerator but not to the halls. This would be a good time to work on the CTOF PMT#3

Tuesday July 26

Past 24 hours

  • Switched to Pb target around 10:30 AM Monday
  • Data taking on Pb target, approx 2.8 B triggers in the past 24 hours

Shift Reports

Reports

Plans

  • Continue taking data on full target
  • Next opportunity to repair CTOF PMT #3 is probably Thursday, tentative RF recovery day

Monday July 25

Past 24 hours

  • Data taking on empty target, approx 2.7 B triggers in the past 24 hours

Shift Reports

Reports

Plans

  • Switch to full target running after the RC meeting


Sunday July 24

Past 24 hours

  • Data taking on empty target, approx 2.8 B triggers in the past 24 hours

Shift Reports

Reports

Plans

  • Continue taking data on empty target until Monday morning.

Saturday July 23

Past 24 hours

  • Data taking on empty target, approx 2.7 B triggers in the past 24 hours

Shift Reports

Reports

Plans

  • In discussions Friday after the RC meeting it was decided to continue data taking on empty target until Monday morning. Then switch to full target.

Friday July 22

Past 24 hours

  • Data taking on empty target, approx 2.1 B triggers in the past 24 hours
  • Priority for beam delivery shifts to Hall D today

Shift Reports

Reports

Plans

  • Continue data taking on empty target until ~ 17:00 today, then switch to full target for running over the weekend

Thursday July 21

Past 24 hours

  • ROCFDC11 Slot 19 FADC125 (possibly?) repaired
  • Solenoid final ramp to 1350 A ~ 5:00 AM
  • Beam returns ~ 5:00 AM
  • Harp scans
  • Start data taking on empty target ~ 6:00 AM

Shift Reports

Reports

Plans

  • Continue data taking on empty target