(July 27th-Aug. 3rd)
(July 27th-Aug. 3rd)
Line 8: Line 8:
 
*Shift Started on Aug. 1st, 8am.  
 
*Shift Started on Aug. 1st, 8am.  
  
August 1st-2nd : investigating and fixing [https://logbooks.jlab.org/entry/3819118 a problem with the front-end of the TagM]. Required several accesses to tagger.  
+
August 1st-2nd : investigating and attempting to fix [https://logbooks.jlab.org/entry/3819118 a problem with the front-end of the TagM]. Required several accesses to tagger.  
  
 
*CW beam arrived around 3am on Aug. 2nd, followed by beam quality checks.   
 
*CW beam arrived around 3am on Aug. 2nd, followed by beam quality checks.   
Line 16: Line 16:
  
 
Upcoming days:
 
Upcoming days:
 +
*TagM communication issue
 
*[https://halldweb.jlab.org/wiki/images/6/68/Week1.png Week 1 time chart]
 
*[https://halldweb.jlab.org/wiki/images/6/68/Week1.png Week 1 time chart]
 
*[https://logbooks.jlab.org/entry/3819445 Richard plan for Act. Col. test ]
 
*[https://logbooks.jlab.org/entry/3819445 Richard plan for Act. Col. test ]

Revision as of 17:29, 2 August 2020

<- Back to Run coordination meeting page


July 27th-Aug. 3rd

  • Beni ramped up the solenoid on Aug. 1st. However, due to a problem with the PXI readout, it was ramped down. The solenoid was ramp-up again (Aug. 2nd) to its nominal 1350A, this time without problem.
  • Target was cooled (C. Keith) and latter filled without problem (Aug. 1st)
  • Shift Started on Aug. 1st, 8am.

August 1st-2nd : investigating and attempting to fix a problem with the front-end of the TagM. Required several accesses to tagger.

Upcoming days: