Difference between revisions of "Run Planning Meeting Notes, July 27-August 5, 2020"

From GlueXWiki
Jump to: navigation, search
(July 27th-Aug. 3rd)
(July 27th-Aug. 3rd)
Line 8: Line 8:
 
*Shift Started on Aug. 1st, 8am.  
 
*Shift Started on Aug. 1st, 8am.  
  
August 1st-2nd : investigating and attempting to fix [https://logbooks.jlab.org/entry/3819118 a problem with the front-end of the TagM]. Did two long accesses to tagger, but the [https://logbooks.jlab.org/entry/3819589 problem remains].  
+
August 1st-2nd : investigating and attempting to fix [https://logbooks.jlab.org/entry/3819118 a problem with the front-end of the TagM]. Did two long accesses to tagger, but the [https://logbooks.jlab.org/entry/3819589 problem remains]. Due to this, [https://logbooks.jlab.org/entry/3819665 the runplan for August 3-4 has been reorganized]
  
 
*CW beam arrived around 3am on Aug. 2nd, followed by beam quality checks.   
 
*CW beam arrived around 3am on Aug. 2nd, followed by beam quality checks.   
Line 15: Line 15:
 
**[https://logbooks.jlab.org/entry/3819406 Beam position optimized (?)], however transmission [https://logbooks.jlab.org/entry/3819632 doesn't appear to be optimal]
 
**[https://logbooks.jlab.org/entry/3819406 Beam position optimized (?)], however transmission [https://logbooks.jlab.org/entry/3819632 doesn't appear to be optimal]
 
**[https://logbooks.jlab.org/entry/3819651 trigger checked out]
 
**[https://logbooks.jlab.org/entry/3819651 trigger checked out]
 +
**Radiation level study done.
 +
**CDC HV scan ongoing.
 +
 +
Issues:
 +
*TagM
 +
*We often get [https://logbooks.jlab.org/entry/3819644 less beam current than requested]
 +
*[https://logbooks.jlab.org/entry/3819644 DAQ start run issue]
 +
*[https://logbooks.jlab.org/entry/3819644 Difficulty in setting CDC HV for CDV HV scan], see also [https://logbooks.jlab.org/entry/3819845 Keigo's entry]
  
 
Upcoming days:
 
Upcoming days:

Revision as of 06:57, 3 August 2020

<- Back to Run coordination meeting page


July 27th-Aug. 3rd

  • Beni ramped up the solenoid on Aug. 1st. However, due to a problem with the PXI readout, it was ramped down. The solenoid was ramp-up again (Aug. 2nd) to its nominal 1350A, this time without problem.
  • Target was cooled (C. Keith) and latter filled without problem (Aug. 1st)
  • Shift Started on Aug. 1st, 8am.

August 1st-2nd : investigating and attempting to fix a problem with the front-end of the TagM. Did two long accesses to tagger, but the problem remains. Due to this, the runplan for August 3-4 has been reorganized

Issues:

Upcoming days: