July 27th-Aug. 2nd

  • Beni ramped up the solenoid on Aug. 1st. However, due to a problem with the PXI readout, it was ramped down. The solenoid was ramp-up again (Aug. 2nd) to its nominal 1350A, this time without problem.
  • Target was cooled (C. Keith) and latter filled without problem (Aug. 1st)
  • Shift Started on Aug. 1st, 8am.

August 1st-2nd : investigating and attempting to fix a problem with the front-end of the TagM. Did two long accesses to tagger, but the problem remains. Due to this, the runplan for August 3-4 has been reorganized

Issues:

Upcoming days:

Aug. 3rd

Run plan for today

  • Took 1h "production" (with TagM down) amorphous run.
  • Hovanes continued the optimization of the transmission.

Issues:

Reports

Upcoming days: