Difference between revisions of "Run Planning Meeting Notes, July 27-August 5, 2020"
From GlueXWiki
m (→Aug. 3rd) |
(→Aug. 3rd) |
||
Line 38: | Line 38: | ||
*Took 1h "production" (with TagM down) amorphous run. | *Took 1h "production" (with TagM down) amorphous run. | ||
− | *Hovanes | + | *[https://logbooks.jlab.org/entry/3820227 Hovanes finalized the optimization of the transmission.] Optimal transmission is obtained for: |
+ | **Profiler: X = - 1.8 Y = - 2.1 | ||
+ | **AC: X = 0.8 Y = -0.4 | ||
+ | *[https://logbooks.jlab.org/entry/3820171 TagM fixed after 1:30pm-4:4-pm access]. Sergey and Lubomir worked opportunistically in the Hall on TRD during Tagger access. | ||
+ | *Sacha finalized the trigger check out | ||
Issues: | Issues: | ||
− | * | + | *[https://logbooks.jlab.org/entry/3820217 instable beam current] (since the start of the run) |
*Monitoring discrepancy: [https://logbooks.jlab.org/entry/3819988 Hovanes observation], [https://logbooks.jlab.org/entry/3819995 Naomi] and [https://logbooks.jlab.org/entry/3820023 Justin] replies | *Monitoring discrepancy: [https://logbooks.jlab.org/entry/3819988 Hovanes observation], [https://logbooks.jlab.org/entry/3819995 Naomi] and [https://logbooks.jlab.org/entry/3820023 Justin] replies | ||
Reports | Reports | ||
*[https://logbooks.jlab.org/entry/3820104 Radiation level study] | *[https://logbooks.jlab.org/entry/3820104 Radiation level study] | ||
+ | *[https://logbooks.jlab.org/entry/3820230 Active Collimator Stability] | ||
Upcoming days: | Upcoming days: |
Revision as of 21:05, 3 August 2020
<- Back to Run coordination meeting page
July 27th-Aug. 2nd
- Beni ramped up the solenoid on Aug. 1st. However, due to a problem with the PXI readout, it was ramped down. The solenoid was ramp-up again (Aug. 2nd) to its nominal 1350A, this time without problem.
- Target was cooled (C. Keith) and latter filled without problem (Aug. 1st)
- Shift Started on Aug. 1st, 8am.
August 1st-2nd : investigating and attempting to fix a problem with the front-end of the TagM. Did two long accesses to tagger, but the problem remains. Due to this, the runplan for August 3-4 has been reorganized
- CW beam arrived around 3am on Aug. 2nd, followed by beam quality checks.
- Radiation levels are good.
- Beam convergence is good
- Beam position optimized (?), however transmission doesn't appear to be optimal
- trigger checked out
- Radiation level study done.
- 15 min calibration runs (in long and production mode) done
- CDC HV scan ongoing.
Issues:
- TagM
- We often get less beam current than requested
- DAQ start run issue: reminder of DIRC mis-communication solution
- Difficulty in setting CDC HV for CDV HV scan, see also Keigo's entry. It was fixed by rebooting the IOC.
Upcoming days:
- Hurricane/tropical storm Isaias
- TagM communication issue
- Week 1 time chart
- Richard plan for Act. Col. test
- Thursday: 1->5 pass change for Hall B. Hall A on-line.
- Tuesday 11th: Maintenance day?
Aug. 3rd
- Took 1h "production" (with TagM down) amorphous run.
- Hovanes finalized the optimization of the transmission. Optimal transmission is obtained for:
- Profiler: X = - 1.8 Y = - 2.1
- AC: X = 0.8 Y = -0.4
- TagM fixed after 1:30pm-4:4-pm access. Sergey and Lubomir worked opportunistically in the Hall on TRD during Tagger access.
- Sacha finalized the trigger check out
Issues:
- instable beam current (since the start of the run)
- Monitoring discrepancy: Hovanes observation, Naomi and Justin replies
Reports
Upcoming days:
- Hurricane/tropical storm Isaias
- TagM communication issue
- Week 1 time chart
- Richard plan for Act. Col. test
- Thursday: 1->5 pass change for Hall B. Hall A on-line.
- Tuesday 11th: Maintenance day?