Difference between revisions of "Run Planning Meeting Notes, July 27-August 5, 2020"

From GlueXWiki
Jump to: navigation, search
(Aug. 3rd)
(Aug. 3rd)
Line 44: Line 44:
 
*[https://logbooks.jlab.org/entry/3820171 TagM fixed after 1:30pm-4:4-pm access]. Sergey and Lubomir worked opportunistically in the Hall on TRD during Tagger access.
 
*[https://logbooks.jlab.org/entry/3820171 TagM fixed after 1:30pm-4:4-pm access]. Sergey and Lubomir worked opportunistically in the Hall on TRD during Tagger access.
 
*TagM HV scan.  
 
*TagM HV scan.  
 +
*[http://zeus.phys.uconn.edu/halld/cobrems/harptool.cgi?harp5C11_xsigma=0.9297&harp5C11_xsigma_err=0.03&harp5C11_ysigma=0.3724&harp5C11_ysigma_err=0.03&harp5C11B_xsigma=0.9896&harp5C11B_xsigma_err=0.15&harp5C11B_ysigma=0.3234&harp5C11B_ysigma_err=0.15&radHarp_xsigma=0.8386&radHarp_xsigma_err=0.02&radHarp_ysigma=0.2405&radHarp_ysigma_err=0.02&harp5C11_spos=102.97&harp5C11B_spos=115.11&emittance_x=0.0038&radHarp_spos=119.7&emittance_y=0.0021&collimator_spos=194.92&fit=fit+and+plot Harp scan]
 +
*Short empty target run (cut short by CEBAF shutting down because of tornado alarm): run 72616, 56M events.
  
 
Tasks to be done:
 
Tasks to be done:

Revision as of 07:46, 4 August 2020

<- Back to Run coordination meeting page


July 27th-Aug. 2nd

  • Beni ramped up the solenoid on Aug. 1st. However, due to a problem with the PXI readout, it was ramped down. The solenoid was ramp-up again (Aug. 2nd) to its nominal 1350A, this time without problem.
  • Target was cooled (C. Keith) and latter filled without problem (Aug. 1st)
  • Shift Started on Aug. 1st, 8am.

August 1st-2nd : investigating and attempting to fix a problem with the front-end of the TagM. Did two long accesses to tagger, but the problem remains. Due to this, the runplan for August 3-4 has been reorganized

Issues:

Upcoming days:

Aug. 3rd

Run plan for today

Tasks completed:

Tasks to be done:

  • Hovanes to check JD70-105 diamond alignement
  • Sacha finalized the trigger check out
  • One production cycle at 150nA
  • Start regular production.

Issues:

Reports:

Upcoming days: