== July 27th-Aug. 3rd ==  
+
== July 27th-Aug. 2nd ==  
  
*Solenoid was ramped up on Aug. 1st. However, due to a problem with the PXI readout, it was ramped down. The solenoid was later on ramp-up again to its nominal 1350A without problem.  
+
*Beni ramped up the solenoid on Aug. 1st. However, due to a problem with the PXI readout, it was ramped down. The solenoid was ramp-up again (Aug. 2nd) to its nominal 1350A, this time without problem.
 +
*Target was cooled (C. Keith) and latter filled without problem (Aug. 1st)
 +
*Shift Started on Aug. 1st, 8am.  
  
August 1st-2nd : investigating and fixing [https://logbooks.jlab.org/entry/3819118 a problem with the front-end of the TagM]. Required several accesses to tagger.  
+
August 1st-2nd : investigating and attempting to fix [https://logbooks.jlab.org/entry/3819118 a problem with the front-end of the TagM]. Did two long accesses to tagger, but the [https://logbooks.jlab.org/entry/3819589 problem remains]. Due to this, [https://logbooks.jlab.org/entry/3819665 the runplan for August 3-4 has been reorganized]
  
 
*CW beam arrived around 3am on Aug. 2nd, followed by beam quality checks.   
 
*CW beam arrived around 3am on Aug. 2nd, followed by beam quality checks.   
 
**Radiation levels are good.
 
**Radiation levels are good.
 
**[https://logbooks.jlab.org/entry/3819476 Beam convergence is good]   
 
**[https://logbooks.jlab.org/entry/3819476 Beam convergence is good]   
 +
**[https://logbooks.jlab.org/entry/3819406 Beam position optimized (?)], however transmission [https://logbooks.jlab.org/entry/3819632 doesn't appear to be optimal]
 +
**[https://logbooks.jlab.org/entry/3819651 trigger checked out]
 +
**Radiation level study done.
 +
**15 min calibration runs (in long and production mode) done
 +
**CDC HV scan ongoing.
 +
 +
Issues:
 +
*TagM
 +
*We often get [https://logbooks.jlab.org/entry/3819644 less beam current than requested]
 +
*[https://logbooks.jlab.org/entry/3819644 DAQ start run issue]: reminder of [https://logbooks.jlab.org/entry/3819929 DIRC mis-communication solution]
 +
*[https://logbooks.jlab.org/entry/3819644 Difficulty in setting CDC HV for CDV HV scan], see also [https://logbooks.jlab.org/entry/3819845 Keigo's entry]. It was fixed by rebooting the IOC.
 +
 +
Upcoming days:
 +
*[https://upload.wikimedia.org/wikipedia/commons/4/40/NHC_AL092020_5day_cone_no_line_and_wind.png Hurricane/tropical storm Isaias]
 +
*TagM communication issue
 +
*[https://halldweb.jlab.org/wiki/images/6/68/Week1.png Week 1 time chart]
 +
*[https://logbooks.jlab.org/entry/3819445 Richard plan for Act. Col. test ]
 +
*Thursday: 1->5 pass change for Hall B. Hall A on-line.
 +
*Tuesday 11th: Maintenance day?
 +
 +
== Aug. 3rd  ==
 +
 +
[https://logbooks.jlab.org/entry/3819971 Run plan for today]
 +
 +
Tasks completed:
 +
*Took 1h "production" (with TagM down) amorphous run.
 +
*[https://logbooks.jlab.org/entry/3820227 Hovanes finalized the optimization of the transmission.] Optimal transmission is obtained for:
 +
**Profiler: X = - 1.8 Y = - 2.1
 +
**AC: X = 0.8 Y = -0.4
 +
*[https://logbooks.jlab.org/entry/3820171 TagM fixed after 1:30pm-4:40-pm access]. Sergey and Lubomir worked opportunistically in the Hall on TRD during Tagger access.
 +
*[http://zeus.phys.uconn.edu/halld/cobrems/harptool.cgi?harp5C11_xsigma=0.9297&harp5C11_xsigma_err=0.03&harp5C11_ysigma=0.3724&harp5C11_ysigma_err=0.03&harp5C11B_xsigma=0.9896&harp5C11B_xsigma_err=0.15&harp5C11B_ysigma=0.3234&harp5C11B_ysigma_err=0.15&radHarp_xsigma=0.8386&radHarp_xsigma_err=0.02&radHarp_ysigma=0.2405&radHarp_ysigma_err=0.02&harp5C11_spos=102.97&harp5C11B_spos=115.11&emittance_x=0.0038&radHarp_spos=119.7&emittance_y=0.0021&collimator_spos=194.92&fit=fit+and+plot Harp scan]
 +
*Short empty target run (cut short by CEBAF shutting down because of tornado alarm): run 72616, 56M events.
 +
 +
Tasks to be done:
 +
*Hovanes to check JD70-105 diamond alignement
 +
*Sacha finalized the trigger check out
 +
*One production cycle at 150nA
 +
*Start regular production.
 +
 +
Issues:
 +
*[https://logbooks.jlab.org/entry/3820217 Instable beam current] (since the start of the run)
 +
*Monitoring discrepancy: [https://logbooks.jlab.org/entry/3819988 Hovanes observation], [https://logbooks.jlab.org/entry/3819995 Naomi] and [https://logbooks.jlab.org/entry/3820023 Justin] replies
 +
*[https://logbooks.jlab.org/entry/3820258 missing evio files]
 +
*[https://upload.wikimedia.org/wikipedia/commons/4/40/NHC_AL092020_5day_cone_no_line_and_wind.png Hurricane/tropical storm Isaias]: CEBAF down and dropped to restricted access. Survey will not start until noon. Beam not expected until late swing. 
 +
 +
Reports:
 +
*[https://logbooks.jlab.org/entry/3820104 Radiation level study]
 +
*[https://logbooks.jlab.org/entry/3820230 Active Collimator Stability]
 +
 +
Upcoming days:
 +
*[https://halldweb.jlab.org/wiki/images/6/68/Week1.png Week 1 time chart]
 +
*[https://logbooks.jlab.org/entry/3819445 Richard plan for Act. Col. test ]
 +
*Thursday: 1->5 pass change for Hall B. Hall A on-line.
 +
*Tuesday 11th: Maintenance day?
 +
 +
 +
== Aug. 4th  ==
 +
 +
Tasks completed:
 +
*None: recovering from Isaias hurricane, with CEBAF going down on 08/03, ~2:30am
 +
 +
Tasks to be done:
 +
*Hovanes to check JD70-105 diamond alignement
 +
*Sacha finalized the trigger check out
 +
*One production cycle at 150nA
 +
*Start regular production.
 +
 +
Issues:
 +
*[https://logbooks.jlab.org/entry/3820217 Instable beam current] (since the start of the run)
 +
 +
Reports:
 +
*[https://logbooks.jlab.org/entry/3820433 leakage current test of active collimator]
 +
 +
 +
[https://logbooks.jlab.org/entry/3820693  Run plan for today]
 +
  
 
Upcoming days:
 
Upcoming days:
 
*[https://halldweb.jlab.org/wiki/images/6/68/Week1.png Week 1 time chart]
 
*[https://halldweb.jlab.org/wiki/images/6/68/Week1.png Week 1 time chart]
 
*[https://logbooks.jlab.org/entry/3819445 Richard plan for Act. Col. test ]
 
*[https://logbooks.jlab.org/entry/3819445 Richard plan for Act. Col. test ]
 +
*Thursday/Friday?: 1->5 pass change for Hall B. Hall A on-line?
 +
*Tuesday 11th: Maintenance day?

Latest revision as of 08:23, 5 August 2020

<- Back to Run coordination meeting page


July 27th-Aug. 2nd

  • Beni ramped up the solenoid on Aug. 1st. However, due to a problem with the PXI readout, it was ramped down. The solenoid was ramp-up again (Aug. 2nd) to its nominal 1350A, this time without problem.
  • Target was cooled (C. Keith) and latter filled without problem (Aug. 1st)
  • Shift Started on Aug. 1st, 8am.

August 1st-2nd : investigating and attempting to fix a problem with the front-end of the TagM. Did two long accesses to tagger, but the problem remains. Due to this, the runplan for August 3-4 has been reorganized

Issues:

Upcoming days:

Aug. 3rd

Run plan for today

Tasks completed:

Tasks to be done:

  • Hovanes to check JD70-105 diamond alignement
  • Sacha finalized the trigger check out
  • One production cycle at 150nA
  • Start regular production.

Issues:

Reports:

Upcoming days:


Aug. 4th

Tasks completed:

  • None: recovering from Isaias hurricane, with CEBAF going down on 08/03, ~2:30am

Tasks to be done:

  • Hovanes to check JD70-105 diamond alignement
  • Sacha finalized the trigger check out
  • One production cycle at 150nA
  • Start regular production.

Issues:

Reports:


Run plan for today


Upcoming days: