(July 27th-Aug. 3rd)
Line 4: Line 4:
 
== July 27th-Aug. 3rd  ==  
 
== July 27th-Aug. 3rd  ==  
  
*Solenoid was ramped up on Aug. 1st. However, due to a problem with the PXI readout, it was ramped down. The solenoid was later on ramp-up again to its nominal 1350A without problem.  
+
*Beni ramped up the solenoid on Aug. 1st. However, due to a problem with the PXI readout, it was ramped down. The solenoid was ramp-up again (Aug. 2nd) to its nominal 1350A, this time without problem.
 +
*Target was cooled (C. Keith) and latter filled without problem (Aug. 1st)
 +
*Shift Started on Aug. 1st, 8am.  
  
 
August 1st-2nd : investigating and fixing [https://logbooks.jlab.org/entry/3819118 a problem with the front-end of the TagM]. Required several accesses to tagger.  
 
August 1st-2nd : investigating and fixing [https://logbooks.jlab.org/entry/3819118 a problem with the front-end of the TagM]. Required several accesses to tagger.  
Line 11: Line 13:
 
**Radiation levels are good.
 
**Radiation levels are good.
 
**[https://logbooks.jlab.org/entry/3819476 Beam convergence is good]   
 
**[https://logbooks.jlab.org/entry/3819476 Beam convergence is good]   
 +
**[https://logbooks.jlab.org/entry/3819406 Beam position optimized]
  
 
Upcoming days:
 
Upcoming days:
 
*[https://halldweb.jlab.org/wiki/images/6/68/Week1.png Week 1 time chart]
 
*[https://halldweb.jlab.org/wiki/images/6/68/Week1.png Week 1 time chart]
 
*[https://logbooks.jlab.org/entry/3819445 Richard plan for Act. Col. test ]
 
*[https://logbooks.jlab.org/entry/3819445 Richard plan for Act. Col. test ]

Revision as of 15:35, 2 August 2020

<- Back to Run coordination meeting page


July 27th-Aug. 3rd

  • Beni ramped up the solenoid on Aug. 1st. However, due to a problem with the PXI readout, it was ramped down. The solenoid was ramp-up again (Aug. 2nd) to its nominal 1350A, this time without problem.
  • Target was cooled (C. Keith) and latter filled without problem (Aug. 1st)
  • Shift Started on Aug. 1st, 8am.

August 1st-2nd : investigating and fixing a problem with the front-end of the TagM. Required several accesses to tagger.