(Created page with "<- Back to [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Summer2020 Run coordination meeting page] == July 27th-Aug. 3rd == *Solenoid was ramped up...") |
(→July 27th-Aug. 3rd) |
||
Line 4: | Line 4: | ||
== July 27th-Aug. 3rd == | == July 27th-Aug. 3rd == | ||
− | * | + | *Beni ramped up the solenoid on Aug. 1st. However, due to a problem with the PXI readout, it was ramped down. The solenoid was ramp-up again (Aug. 2nd) to its nominal 1350A, this time without problem. |
+ | *Target was cooled (C. Keith) and latter filled without problem (Aug. 1st) | ||
+ | *Shift Started on Aug. 1st, 8am. | ||
August 1st-2nd : investigating and fixing [https://logbooks.jlab.org/entry/3819118 a problem with the front-end of the TagM]. Required several accesses to tagger. | August 1st-2nd : investigating and fixing [https://logbooks.jlab.org/entry/3819118 a problem with the front-end of the TagM]. Required several accesses to tagger. | ||
Line 11: | Line 13: | ||
**Radiation levels are good. | **Radiation levels are good. | ||
**[https://logbooks.jlab.org/entry/3819476 Beam convergence is good] | **[https://logbooks.jlab.org/entry/3819476 Beam convergence is good] | ||
+ | **[https://logbooks.jlab.org/entry/3819406 Beam position optimized] | ||
Upcoming days: | Upcoming days: | ||
*[https://halldweb.jlab.org/wiki/images/6/68/Week1.png Week 1 time chart] | *[https://halldweb.jlab.org/wiki/images/6/68/Week1.png Week 1 time chart] | ||
*[https://logbooks.jlab.org/entry/3819445 Richard plan for Act. Col. test ] | *[https://logbooks.jlab.org/entry/3819445 Richard plan for Act. Col. test ] |
Revision as of 15:35, 2 August 2020
<- Back to Run coordination meeting page
July 27th-Aug. 3rd
- Beni ramped up the solenoid on Aug. 1st. However, due to a problem with the PXI readout, it was ramped down. The solenoid was ramp-up again (Aug. 2nd) to its nominal 1350A, this time without problem.
- Target was cooled (C. Keith) and latter filled without problem (Aug. 1st)
- Shift Started on Aug. 1st, 8am.
August 1st-2nd : investigating and fixing a problem with the front-end of the TagM. Required several accesses to tagger.
- CW beam arrived around 3am on Aug. 2nd, followed by beam quality checks.
- Radiation levels are good.
- Beam convergence is good
- Beam position optimized
Upcoming days: