*Shift Started on Aug. 1st, 8am. | *Shift Started on Aug. 1st, 8am. | ||
− | August 1st-2nd : investigating and attempting to fix [https://logbooks.jlab.org/entry/3819118 a problem with the front-end of the TagM]. | + | August 1st-2nd : investigating and attempting to fix [https://logbooks.jlab.org/entry/3819118 a problem with the front-end of the TagM]. Did two long accesses to tagger, but the [https://logbooks.jlab.org/entry/3819589 problem remains]. |
*CW beam arrived around 3am on Aug. 2nd, followed by beam quality checks. | *CW beam arrived around 3am on Aug. 2nd, followed by beam quality checks. | ||
Line 14: | Line 14: | ||
**[https://logbooks.jlab.org/entry/3819476 Beam convergence is good] | **[https://logbooks.jlab.org/entry/3819476 Beam convergence is good] | ||
**[https://logbooks.jlab.org/entry/3819406 Beam position optimized (?)], however transmission [https://logbooks.jlab.org/entry/3819632 doesn't appear to be optimal] | **[https://logbooks.jlab.org/entry/3819406 Beam position optimized (?)], however transmission [https://logbooks.jlab.org/entry/3819632 doesn't appear to be optimal] | ||
− | **[trigger | + | **[https://logbooks.jlab.org/entry/3819651 trigger checked out] |
Upcoming days: | Upcoming days: |
Revision as of 23:31, 2 August 2020
<- Back to Run coordination meeting page
July 27th-Aug. 3rd
- Beni ramped up the solenoid on Aug. 1st. However, due to a problem with the PXI readout, it was ramped down. The solenoid was ramp-up again (Aug. 2nd) to its nominal 1350A, this time without problem.
- Target was cooled (C. Keith) and latter filled without problem (Aug. 1st)
- Shift Started on Aug. 1st, 8am.
August 1st-2nd : investigating and attempting to fix a problem with the front-end of the TagM. Did two long accesses to tagger, but the problem remains.
- CW beam arrived around 3am on Aug. 2nd, followed by beam quality checks.
- Radiation levels are good.
- Beam convergence is good
- Beam position optimized (?), however transmission doesn't appear to be optimal
- trigger checked out
Upcoming days:
- TagM communication issue
- Week 1 time chart
- Richard plan for Act. Col. test