July 27th-Aug. 3rd
- Solenoid was ramped up on Aug. 1st. However, due to a problem with the PXI readout, it was ramped down. The solenoid was later on ramp-up again to its nominal 1350A without problem.
August 1st-2nd : investigating and fixing a problem with the front-end of the TagM. Required several accesses to tagger.
- CW beam arrived around 3am on Aug. 2nd, followed by beam quality checks.
- Radiation levels are good.
- Beam convergence is good
Upcoming days: