Run Planning Meeting Notes, July 27-August 5, 2020

From GlueXWiki
Revision as of 06:57, 3 August 2020 by Deurpam (Talk | contribs) (July 27th-Aug. 3rd)

Jump to: navigation, search

<- Back to Run coordination meeting page


July 27th-Aug. 3rd

  • Beni ramped up the solenoid on Aug. 1st. However, due to a problem with the PXI readout, it was ramped down. The solenoid was ramp-up again (Aug. 2nd) to its nominal 1350A, this time without problem.
  • Target was cooled (C. Keith) and latter filled without problem (Aug. 1st)
  • Shift Started on Aug. 1st, 8am.

August 1st-2nd : investigating and attempting to fix a problem with the front-end of the TagM. Did two long accesses to tagger, but the problem remains. Due to this, the runplan for August 3-4 has been reorganized

Issues:

Upcoming days: