Difference between revisions of "Run Planning Meeting Notes, July 28- August 3, 2022"

From GlueXWiki
Jump to: navigation, search
(Wednesday August 3)
Line 12: Line 12:
 
= Wednesday August 3 =
 
= Wednesday August 3 =
 
=== Past 24 hours ===
 
=== Past 24 hours ===
 +
* Beam returns @ 10:00, take AMO run
 
* [https://logbooks.jlab.org/entry/4023321 Switched to empty target @ 10:40]
 
* [https://logbooks.jlab.org/entry/4023321 Switched to empty target @ 10:40]
 
* Beam down since midnight due to RF   
 
* Beam down since midnight due to RF   
Line 25: Line 26:
 
* [https://logbooks.jlab.org/entry/4023264 AC Beam Position Variation] (from yesterday)
 
* [https://logbooks.jlab.org/entry/4023264 AC Beam Position Variation] (from yesterday)
 
* [https://logbooks.jlab.org/entry/4023307 Main trigger yield increase] [https://logbooks.jlab.org/entry/4023347], [https://logbooks.jlab.org/entry/4023353], [https://logbooks.jlab.org/entry/4023354]
 
* [https://logbooks.jlab.org/entry/4023307 Main trigger yield increase] [https://logbooks.jlab.org/entry/4023347], [https://logbooks.jlab.org/entry/4023353], [https://logbooks.jlab.org/entry/4023354]
* [https://logbooks.jlab.org/entry/4023417 5C11 Y-position lock turned on ~13:30]
+
* [https://logbooks.jlab.org/entry/4023417 5C11 Y-position lock turned on ~13:30][https://logbooks.jlab.org/entry/4023532]
 
=== Plans ===
 
=== Plans ===
 
* Production running on empty target until Thursday
 
* Production running on empty target until Thursday

Revision as of 07:27, 3 August 2022

Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs


Wednesday August 3

Past 24 hours

Shift Reports

Reports

Plans

  • Production running on empty target until Thursday
  • Thursday morning, TAC run starting ~9am (7-8 hours, assuming stable beam)

Tuesday August 2

Past 24 hours

  • Beam studies for Hall-C ~2hrs(=5+hrs)
  • Empty target inserted
  • FCAL base replacement
  • Solenoid trip shortly after 16:00 [5],[6],[7],[8]
  • Back to Pb target in preparation for FCAL pi0 calibration run while magnet ramps
  • Beam returns ~2am
  • Harp scans
  • ~1.3B triggers

Shift Reports

Reports

Issues

Plans

  • Switch to empty target now
  • Maintenance Day Wed. starting ~6:30am
  • TAC run Thursday?

Monday August 1

Past 72 hours

  • Fri: ~3.9B triggers
  • Sat: ~3.0B triggers
  • Sun: >2.5B triggers
  • Half-wave plate moved out on Sunday afternoon
  • RootSpy issues and here
  • Counting house not host of zoom meeting log entry
  • Gas shed key missing

Shift Reports

Reports

Plans

  • Switch to empty target during accelerator down time (>=2hr)
  • Production running on empty target for 1.5 days

Sunday July 31

Shift Reports

Saturday July 30

Shift Reports


Friday July 29

Past 24 hours

  • Thanks Rory for previous RC shift
  • Beam studies during Day shift
  • Mark D.: Safety walk-through
  • Beni: CTOF repair, Mark: gain equalization
  • Mark+Malte: FCAL repairs
  • Beam returned ~16:30
  • ~2.0B triggers

Shift Reports

Reports

Plans

  • Long mode run 1/2 hour
  • Production running on Pb through weekend
  • No meetings over weekend

Thursday July 28

Past 24 hours

  • Beam returned ~ noon
  • Harp scans
  • Production data taking ~ 13:30
  • ~2.9B triggers

Shift Reports

Reports

Plans

  • Beam Studies today
  • Hall-D Walk through - Mark D.
  • CTOF PMT Repair - Beni Z.
  • Production running on Pb when beam returns