(Thursday June 23)
(Thursday June 23)
Line 16: Line 16:
 
#* [https://logbooks.jlab.org/entry/4005968 Richard took the microscope scan data]
 
#* [https://logbooks.jlab.org/entry/4005968 Richard took the microscope scan data]
 
#* [https://logbooks.jlab.org/entry/4005967 Bleedthrough beam current was very low]  
 
#* [https://logbooks.jlab.org/entry/4005967 Bleedthrough beam current was very low]  
#* Wed evening: The target is out already. Sasha will set up the straight track trigger, then start the TAC run at whatever beam current was chosen earlier.  
+
#* Thunderstorms made TAC run impossible.
 +
#* [https://logbooks.jlab.org/entry/4006090 Sasha configured the trigger for straight track running]
 +
#* Beam back near midnight but ran into DAQ problems.  
 +
#* Overnight empty target production
 
#Shift Summaries  
 
#Shift Summaries  
#* [https://logbooks.jlab.org/entry/4005862 day]
+
#* [https://logbooks.jlab.org/entry/4005862 day] [https://logbooks.jlab.org/entry/4006016 swing] [https://logbooks.jlab.org/entry/4006118 owl] [https://logbooks.jlab.org/entry/4006219 early riser]
 
#Reports
 
#Reports
 
#Issues
 
#Issues
#* Tagger NMR
+
#* [https://logbooks.jlab.org/entry/4006157 DAQ crash ROCTRIG2]
#* DIRC sensor
+
#* (Tagger NMR)
 +
#* DIRC sensor)
 
#* DAQ livetime
 
#* DAQ livetime
#* Beam position stability
+
#* (Beam position stability)
#* U1-10-TOP MPOD crate
+
#* (U1-10-TOP MPOD crate)
 
#Plans
 
#Plans
 
#*No beam from 6:30am until sometime after 3pm, power shedding.
 
#*No beam from 6:30am until sometime after 3pm, power shedding.

Revision as of 07:19, 23 June 2022

↑ Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Thursday June 23

  1. Last 24h:
  2. Shift Summaries
  3. Reports
  4. Issues
    • DAQ crash ROCTRIG2
    • (Tagger NMR)
    • DIRC sensor)
    • DAQ livetime
    • (Beam position stability)
    • (U1-10-TOP MPOD crate)
  5. Plans
    • No beam from 6:30am until sometime after 3pm, power shedding.
    • Walk-through at 11am
  6. Commissioning steps temporarily postponed:
    • Flux optimization/Act .Col. calibration
    • Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.