Run Planning Meeting Notes, June 23 - June 29, 2022

From GlueXWiki
Revision as of 15:27, 22 June 2022 by Njarvis (Talk | contribs) (Created page with "↑ Back to Run Coordination Meetings:Summer2022 Meeting are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meetin...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

↑ Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Thursday June 23

  1. Last 24h:
    • Wed evening: The target is out already. Sasha will set up the straight track trigger, then start the TAC run at whatever beam current was chosen earlier.
  2. Shift Summaries
  3. Reports
  4. Issues
    • Tagger NMR
    • DIRC sensor
    • DAQ livetime
    • Beam position stability
    • U1-10-TOP MPOD crate
  5. Plans
    • No beam from 6:30am until sometime after 3pm, power shedding.
    • Walk-through at 11am
  6. Commissioning steps temporarily postponed:
    • Flux optimization/Act .Col. calibration
    • Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.