Difference between revisions of "Run Planning Meeting Notes, June 30 - July 06, 2022"

From GlueXWiki
Jump to: navigation, search
(Thursday June 30)
(Past 24 hours)
Line 28: Line 28:
 
* [https://logbooks.jlab.org/entry/4009005 Loss of NMR comm in Tagger Manet ]
 
* [https://logbooks.jlab.org/entry/4009005 Loss of NMR comm in Tagger Manet ]
 
* again very bad life time 10% only! (stopped run 100778) but also beam lost beam at the same time.
 
* again very bad life time 10% only! (stopped run 100778) but also beam lost beam at the same time.
 +
** stopping and restarting the DAQ with new run 100779 cured the issue of low lifetime, but soon beam was lost again.
 
* beam on and off for some time, finally off with problems in several cavities one whole (1L15) zone no beam for several hours.
 
* beam on and off for some time, finally off with problems in several cavities one whole (1L15) zone no beam for several hours.
 +
 
=== Shift report ===
 
=== Shift report ===
 
* [https://logbooks.jlab.org/entry/4008732 day shift summary]
 
* [https://logbooks.jlab.org/entry/4008732 day shift summary]

Revision as of 07:37, 30 June 2022

Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Thursday June 30

Past 24 hours

Overarching theme of the past 24 hours: "herding cats"

  • no beam during the day, machine optimization to deliver high current beam to HallC (unsuccessful)
  • beam back around 5:30pm
  • did first two Harp scans with HallD laser on and off while hallC had around 17uA of beam
  • general beam conditions are rather unstable. beam strip chart
  • continue data taking over night
  • DAQ issues again with life time dropping to 60%. Shift crew called Sergey.
    • found problem with Slot 3 fiber 7 having trouble (I think this is seen in roctrig1?)
    • after Sergey's intervention DAQ came slowly back to "normal"
  • beam conditions are very unstable over night
  • Loss of NMR comm in Tagger Manet
  • again very bad life time 10% only! (stopped run 100778) but also beam lost beam at the same time.
    • stopping and restarting the DAQ with new run 100779 cured the issue of low lifetime, but soon beam was lost again.
  • beam on and off for some time, finally off with problems in several cavities one whole (1L15) zone no beam for several hours.

Shift report

Reports

Issues

  • beam conditions(e,gamma): quality/stability

Plans