=Thursday June 30=
+
= Friday July 1 =
 +
=== Past 24 hours ===
 +
 
 +
=== Shift reports ===
 +
*[https://logbooks.jlab.org/entry/4009095 day shift summary]
 +
*
 +
*
 +
*
 +
 
 +
=== Reports ===
 +
* low invariant mass +/- pair tracks are indeed leptons: [https://logbooks.jlab.org/entry/4009188 E/p vs Mass]
 +
=== Issues ===
 +
=== Plans ===
 +
 
 +
= Thursday June 30=
 
=== Past 24 hours ===
 
=== Past 24 hours ===
 
Overarching theme of the past 24 hours: "herding cats"
 
Overarching theme of the past 24 hours: "herding cats"
Line 53: Line 67:
 
* CPP/NPP: TBD
 
* CPP/NPP: TBD
 
** first do harp scans when beam comes back
 
** first do harp scans when beam comes back
** do first an Amo run using goniometer Al radiator.
+
** do first an Amo run using goniometer Al radiator if that does not work due to ion chamber try target ladder Al radiator.
 +
** continue nominal production data taking on diamond.

Revision as of 17:14, 30 June 2022

Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Friday July 1

Past 24 hours

Shift reports

Reports

  • low invariant mass +/- pair tracks are indeed leptons: E/p vs Mass

Issues

Plans

Thursday June 30

Past 24 hours

Overarching theme of the past 24 hours: "herding cats"

  • no beam during the day, machine optimization to deliver high current beam to HallC (unsuccessful)
  • beam back around 5:30pm
  • did first two Harp scans with HallD laser on and off while hallC had around 17uA of beam
  • general beam conditions are rather unstable. beam strip chart
  • continue data taking over night
  • DAQ issues again with life time dropping to 60%. Shift crew called Sergey.
    • found problem with Slot 3 fiber 7 having trouble (I think this is seen in roctrig1?)
    • after Sergey's intervention DAQ came slowly back to "normal"
  • beam conditions are very unstable over night
  • Loss of NMR comm in Tagger Manet
  • again very bad life time 10% only! (stopped run 100778) but also beam lost beam at the same time.
    • stopping and restarting the DAQ with new run 100779 cured the issue of low lifetime, but soon beam was lost again.
  • beam on and off for some time, finally off with problems in several cavities one whole (1L15) zone no beam for several hours.

Shift reports

Reports

Issues

  • HallD beam conditions(e,gamma): quality/stability
    • Tuned beam and CW beam to hallD looks different ELOG entry
  • HallC beam high current not reached, current reached 30uA

Plans

  • MCC: Machine needs to replace "breaker" in 1L15
    • last time this work took about 6 hours
    • NL and SL to be taken down
    • take this opportunity to assess relocation of some BLM in the machine
  • expect beam no earlier then swing shift.
  • CPP/NPP: TBD
    • first do harp scans when beam comes back
    • do first an Amo run using goniometer Al radiator if that does not work due to ion chamber try target ladder Al radiator.
    • continue nominal production data taking on diamond.