Friday July 1

Past 24 hours

  • start out with no beam. Beam lost due to 1L15. whole day shift needed to replace "braker" for zone 1L15
  • after accelerator repair work, efforts are taken to establish beam in the machine and try to increase beam current for HallC
  • Bobby and Ilya entered to hall to investigate the target moving mechanism.
  • Justin rebooted crate U1-1-top to reestablish BCAL LED trigger
  • the magnetic field measurement of the tagger magnet is still not working. See earlier report
  • beam back after 10pm started doing harp scan first: Harp Scan Results
  • shift crew was not able to write halld scan pictures into logbook: see owl shift summary
  • take first data with Amo radiator on goniometer and then production with diamond. pretty much very time a runs was restarred the life time was bad and the DAQ required full restart.
  • the beam position on the AC may be more stable in then in the past: requires closer look
  • the DAQ liftime keeps posing issues: DAQ lifetime monitoring
  • from Epics Overview all looks ok, the rates in the very low tagger enegery counters are low, but the scale of the high rates counters dominates the plot. But maybe the rates in those counter may in fact be dominated by scraping? -> needs closer look see also report from Hovanes on harp scans


Shift reports

Reports

  • low invariant mass +/- pair tracks are indeed leptons: E/p vs Mass
  • target position mechanism and small variations:
    Screen1.jpeg
  • tbd

Issues

  • tagger NMR probe not operational,TAGGER NMR. The magnet itself is controlled by MCC
  • DAQ issues with low life time seems to happen more frequently affecting almost every stop/start run action.

Plans

Thursday June 30

Past 24 hours

Overarching theme of the past 24 hours: "herding cats"

  • no beam during the day, machine optimization to deliver high current beam to HallC (unsuccessful)
  • beam back around 5:30pm
  • did first two Harp scans with HallD laser on and off while hallC had around 17uA of beam
  • general beam conditions are rather unstable. beam strip chart
  • continue data taking over night
  • DAQ issues again with life time dropping to 60%. Shift crew called Sergey.
    • found problem with Slot 3 fiber 7 having trouble (I think this is seen in roctrig1?)
    • after Sergey's intervention DAQ came slowly back to "normal"
  • beam conditions are very unstable over night
  • Loss of NMR comm in Tagger Manet
  • again very bad life time 10% only! (stopped run 100778) but also beam lost beam at the same time.
    • stopping and restarting the DAQ with new run 100779 cured the issue of low lifetime, but soon beam was lost again.
  • beam on and off for some time, finally off with problems in several cavities one whole (1L15) zone no beam for several hours.

Shift reports

Reports

Issues

  • HallD beam conditions(e,gamma): quality/stability
    • Tuned beam and CW beam to hallD looks different ELOG entry
  • HallC beam high current not reached, current reached 30uA

Plans

  • MCC: Machine needs to replace "breaker" in 1L15
    • last time this work took about 6 hours
    • NL and SL to be taken down
    • take this opportunity to assess relocation of some BLM in the machine
  • expect beam no earlier then swing shift.
  • CPP/NPP: TBD
    • first do harp scans when beam comes back
    • do first an Amo run using goniometer Al radiator if that does not work due to ion chamber try target ladder Al radiator.
    • continue nominal production data taking on diamond.