== Thursday, March 1 ==
+
== Thursday, March 1 @ 8:45am ==
 
# Notes from the previous 24 hours:
 
# Notes from the previous 24 hours:
 
#* MCC reports
 
#* MCC reports
Line 31: Line 31:
 
#* Production: back 4 more
 
#* Production: back 4 more
  
== Friday, March 2 ==
+
== Friday, March 2 @ 8:45am ==
 
# Notes from the previous 24 hours:
 
# Notes from the previous 24 hours:
#* Hall D low-current orbit lock test for TAC runs: succeeded in good horizontal orbit lock down to a few nA [https://logbooks.jlab.org/entry/3540864]
+
#* Hall D low-current orbit lock test for TAC runs: succeeded in good horizontal orbit lock down to a few nA [https://logbooks.jlab.org/entry/3540864] - another test was planned today at noon
 
#* Production runs: JD70-100 150nA and AMO, 180nA; Day: [https://logbooks.jlab.org/entry/3540726], Swing: [https://logbooks.jlab.org/entry/3540934], Owl: [https://logbooks.jlab.org/entry/3541172]
 
#* Production runs: JD70-100 150nA and AMO, 180nA; Day: [https://logbooks.jlab.org/entry/3540726], Swing: [https://logbooks.jlab.org/entry/3540934], Owl: [https://logbooks.jlab.org/entry/3541172]
 +
#* magnet north linac -- at least 2 hours (maybe 6): program access
 
# Issues:
 
# Issues:
 
#* DAQ crashes at go (Sasha fixed it) ~40 mins banu [https://logbooks.jlab.org/entry/3540873, https://logbooks.jlab.org/entry/3540927]
 
#* DAQ crashes at go (Sasha fixed it) ~40 mins banu [https://logbooks.jlab.org/entry/3540873, https://logbooks.jlab.org/entry/3540927]
Line 42: Line 43:
 
#* cdc rates during current scan 41343-41347 [https://logbooks.jlab.org/entry/3540987] [BZ]
 
#* cdc rates during current scan 41343-41347 [https://logbooks.jlab.org/entry/3540987] [BZ]
 
#* low level monitoring [https://logbooks.jlab.org/entry/3541329] [TB]  
 
#* low level monitoring [https://logbooks.jlab.org/entry/3541329] [TB]  
#* beam [AD]
+
#* Hall D BEM stopped reporting yesterday near 6pm [https://logbooks.jlab.org/entry/3540694] [AD]
 
#* CDC pressure alarm [https://logbooks.jlab.org/entry/3541040] [CG]
 
#* CDC pressure alarm [https://logbooks.jlab.org/entry/3541040] [CG]
#* Muon Chamber noise [https://logbooks.jlab.org/entry/3541376] [DL]
+
#* Muon Chamber noise [https://logbooks.jlab.org/entry/3536388][https://logbooks.jlab.org/entry/3539241][https://logbooks.jlab.org/entry/3541376] [DL]
 
# Planning:
 
# Planning:
 
#* updated run time chart [https://halldweb1.jlab.org/wiki/index.php/File:Spring18_week8.jpg]
 
#* updated run time chart [https://halldweb1.jlab.org/wiki/index.php/File:Spring18_week8.jpg]
Line 51: Line 52:
 
#* Sasha planning ~30 min run using the thicker 750 um thick converter. Goals: data sample for Sebastian to evaluate possible pile-up in the TPOL and pre-scale for PS trigger
 
#* Sasha planning ~30 min run using the thicker 750 um thick converter. Goals: data sample for Sebastian to evaluate possible pile-up in the TPOL and pre-scale for PS trigger
 
#* Production running
 
#* Production running
 +
 +
== Saturday, March 3 ==
 +
# No meeting today
 +
 +
== Sunday, March 4 @ 10:30am ==
 +
# Notes from the previous 24 hours:
 +
#* Production sequence; run with ~100M events with changed converter to 750um [https://logbooks.jlab.org/entry/3542517].
 +
#* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2018-01/index.html Trigger graph]
 +
# Issues:
 +
#* DAQ: (20 minutes of resets), roc_reboot of rocPS1, error of wrong pedestal in rocPS1; FDC HV alarm on c2 hv4: reset and rebooted HV. [https://logbooks.jlab.org/entry/3542147] [CG]
 +
# Reports
 +
#* today expect beam down (due to cavity issue) ~3h [MCC]
 +
#* low level monitoring [https://logbooks.jlab.org/entry/3542463] [TB]
 +
#* cdc rates during intensity scan [https://logbooks.jlab.org/entry/3542498] [BZ]
 +
# Today's run plan (updated) [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]:
 +
#* ~11:30am started raw mode
 +
#* threshold scan for CDC 
 +
#* empty target + harp scan
 +
#* back to production
 +
# Planning:
 +
#*Next Monday ~6h (FSD+optics): program work in the Hall
 +
 +
== Monday, March 5 @ 8:45am  ==
 +
# Notes from the previous 24 hours:
 +
#* 7:45am MCC meeting report: T. Satogata na BPM studies ~9am ; 10-11am opportunistic beam; starting 11am rapid access to Hall; requested survey of tagger Hall for controlled access.
 +
#* yesterday: raw-mode 10 mins test
 +
#* threshold scan for CDC
 +
#* empty target
 +
#* production
 +
# Issues:
 +
#* TAGM column occupancy [https://logbooks.jlab.org/entry/3542664] [CG]
 +
#* High level servers from rootspy not staying alive -> reboot rocTAGMH crate [https://logbooks.jlab.org/entry/3542743] [CG, DL]
 +
#* DigiHits plot differences [https://logbooks.jlab.org/entry/3542761]
 +
# Reports
 +
#* low level monitoring [https://logbooks.jlab.org/entry/3542933]
 +
# Today's run plan (updated) [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]:
 +
#* updated time chart [https://halldweb.jlab.org/wiki/index.php/File:Spring18_week8.jpg]
 +
# Planning:
 +
#* Morning: access starting 11am. All work done by 3pm (none in the Hall).
 +
#* ??? back to physics program after beam downtime
 +
 +
== Tuesday, March 6 @ 8:45am  ==
 +
# Notes from the previous 24 hours:
 +
#* power outage [https://logbooks.jlab.org/entry/3543255]
 +
#* 7:45am MCC meeting report: replace of transformer may take ~ 1 week. Cancel next 48 hours shifts.
 +
#* Hall D vertical cavity BPM lock test [https://logbooks.jlab.org/entry/3543054] [TS]
 +
#* Controlled Access:
 +
#** FCAL base replacement [https://logbooks.jlab.org/entry/3543160] [CG]
 +
#** NPS Compcal prototype [https://logbooks.jlab.org/entry/3543124] [AS]
 +
#** Swapped electronics board in Tagger Hall [AB]
 +
# Issues:
 +
#* No communication to FDC/CDC HV in CAEN mainframe [https://logbooks.jlab.org/entry/3543166] [LP, HE]
 +
#* Servers for BEM HALLD:p, BEM HDTGR:p down  [https://logbooks.jlab.org/entry/3543197] [AD, SD]
 +
# Reports
 +
#* low level monitoring
 +
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3563 Effect of cdc time cut on ρ and ω reconstruction] [ST]
 +
#* [https://logbooks.jlab.org/entry/3543325 intensity scan update] [JS]
 +
#* last week: time-chart [https://halldweb1.jlab.org/wiki/images/8/84/Timechart_new.png], metrics [https://halldweb.jlab.org/wiki/images/f/f2/TBA_tot_n.png]
 +
# Today's run plan (updated) [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]:
 +
# Planning:
 +
#*access to Hall for major works.
 +
# Announcements?
 +
 +
== Wednesday, March 7 @ 8:45am  ==
 +
# Notes from the previous 24 hours:
 +
#* 8:00am MCC meeting report:
 +
#** transformers
 +
#** ~ 1 week w/o beam
 +
#** run extension
 +
# Reports:
 +
#*PWO calorimeter prototype installed behind the PS [https://logbooks.jlab.org/entry/3543505] [AS, VB, TC, NS, IL]
 +
# Discussion: Dependence of Efficiency on Rate [https://halldweb.jlab.org/wiki-private/index.php/Dependence_of_Efficiency_on_Rate]
 +
# AOB

Latest revision as of 09:36, 7 March 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, March 1 @ 8:45am

  1. Notes from the previous 24 hours:
    • MCC reports
    • Production Data with 58um JD70-100 diamond in the early afternoon
    • At about 6pm, we started low intensity scan as proposed in Justin's google sheet
    • For these runs: (i) Hovanes reverted the collimator position to the same value used in the previous current scan, (ii) We reverted to the previous value of the CDC window offset
    • [Beam Position Strip Chart, AC, PS Coincidence Monitoring https://logbooks.jlab.org/entry/3540484] (small interruption from 9pm-10pm)
  2. Issues:
    • (fixed) Sean updated the CDC timing for the low intensity scan, see [1]. This has to be switched it back in production (see also this entry). How to restore production running (by Elton) [2].
    • Hall D BEM stopped reporting yesterday near 6pm [3] [AD]
  3. Reports (some of these shown at the AWG yesterday):
    • Production vertex position before/after collimator shift (runs 40496 and 40509) [AA]
    • Pedestals Monitor FCAL, BCAL (run 41546 - production) [4] [SF]
    • Beam Trip map updated in CCDB [5] [DL]
    • low level monitoring [6] [TB]
    • yesterday AWG meeting [7]
    • Slope of the coherent peak high energy edge [8] [JS]
  4. Planning:
    • updated run time chart [9]
  5. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • morning: harp scan [10],[11],[12]
    • Production
    • Hall D low-current orbit lock test for TAC runs
    • Production: back 4 more

Friday, March 2 @ 8:45am

  1. Notes from the previous 24 hours:
    • Hall D low-current orbit lock test for TAC runs: succeeded in good horizontal orbit lock down to a few nA [13] - another test was planned today at noon
    • Production runs: JD70-100 150nA and AMO, 180nA; Day: [14], Swing: [15], Owl: [16]
    • magnet north linac -- at least 2 hours (maybe 6): program access
  2. Issues:
    • DAQ crashes at go (Sasha fixed it) ~40 mins banu https://logbooks.jlab.org/entry/3540927
    • downtime - issue with one of the cavities ~1.5h (2L15-4 dropping zone from HV; Cavity bypassed; still dropping zone. EES-RF contacted.)
    • FDC trips during owl shift [17] [SF, VC]
  3. Reports
    • cdc rates during current scan 41343-41347 [18] [BZ]
    • low level monitoring [19] [TB]
    • Hall D BEM stopped reporting yesterday near 6pm [20] [AD]
    • CDC pressure alarm [21] [CG]
    • Muon Chamber noise [22][23][24] [DL]
  4. Planning:
    • updated run time chart [25]
  5. Today's run plan (TBD) Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • harp scan
    • Sasha planning ~30 min run using the thicker 750 um thick converter. Goals: data sample for Sebastian to evaluate possible pile-up in the TPOL and pre-scale for PS trigger
    • Production running

Saturday, March 3

  1. No meeting today

Sunday, March 4 @ 10:30am

  1. Notes from the previous 24 hours:
    • Production sequence; run with ~100M events with changed converter to 750um [26].
    • Trigger graph
  2. Issues:
    • DAQ: (20 minutes of resets), roc_reboot of rocPS1, error of wrong pedestal in rocPS1; FDC HV alarm on c2 hv4: reset and rebooted HV. [27] [CG]
  3. Reports
    • today expect beam down (due to cavity issue) ~3h [MCC]
    • low level monitoring [28] [TB]
    • cdc rates during intensity scan [29] [BZ]
  4. Today's run plan (updated) Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • ~11:30am started raw mode
    • threshold scan for CDC
    • empty target + harp scan
    • back to production
  5. Planning:
    • Next Monday ~6h (FSD+optics): program work in the Hall

Monday, March 5 @ 8:45am

  1. Notes from the previous 24 hours:
    • 7:45am MCC meeting report: T. Satogata na BPM studies ~9am ; 10-11am opportunistic beam; starting 11am rapid access to Hall; requested survey of tagger Hall for controlled access.
    • yesterday: raw-mode 10 mins test
    • threshold scan for CDC
    • empty target
    • production
  2. Issues:
    • TAGM column occupancy [30] [CG]
    • High level servers from rootspy not staying alive -> reboot rocTAGMH crate [31] [CG, DL]
    • DigiHits plot differences [32]
  3. Reports
    • low level monitoring [33]
  4. Today's run plan (updated) Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • updated time chart [34]
  5. Planning:
    • Morning: access starting 11am. All work done by 3pm (none in the Hall).
    •  ??? back to physics program after beam downtime

Tuesday, March 6 @ 8:45am

  1. Notes from the previous 24 hours:
    • power outage [35]
    • 7:45am MCC meeting report: replace of transformer may take ~ 1 week. Cancel next 48 hours shifts.
    • Hall D vertical cavity BPM lock test [36] [TS]
    • Controlled Access:
      • FCAL base replacement [37] [CG]
      • NPS Compcal prototype [38] [AS]
      • Swapped electronics board in Tagger Hall [AB]
  2. Issues:
    • No communication to FDC/CDC HV in CAEN mainframe [39] [LP, HE]
    • Servers for BEM HALLD:p, BEM HDTGR:p down [40] [AD, SD]
  3. Reports
  4. Today's run plan (updated) Run Plan Google Calendar Accel. Run Plan Google Calendar:
  5. Planning:
    • access to Hall for major works.
  6. Announcements?

Wednesday, March 7 @ 8:45am

  1. Notes from the previous 24 hours:
    • 8:00am MCC meeting report:
      • transformers
      • ~ 1 week w/o beam
      • run extension
  2. Reports:
    • PWO calorimeter prototype installed behind the PS [43] [AS, VB, TC, NS, IL]
  3. Discussion: Dependence of Efficiency on Rate [44]