Difference between revisions of "Run Planning Meeting Notes, Mar 1-Mar 7, 2018"
From GlueXWiki
(→Thursday, March 1) |
(→Thursday, March 1) |
||
Line 14: | Line 14: | ||
# Issues: | # Issues: | ||
#* (fixed) Sean updated the CDC timing for the low intensity scan, see [https://logbooks.jlab.org/entry/3540445]. This has to be switched it back in production (see also this [https://logbooks.jlab.org/entry/3537413 entry]). How to restore production running (by Elton) [https://logbooks.jlab.org/entry/3540466]. | #* (fixed) Sean updated the CDC timing for the low intensity scan, see [https://logbooks.jlab.org/entry/3540445]. This has to be switched it back in production (see also this [https://logbooks.jlab.org/entry/3537413 entry]). How to restore production running (by Elton) [https://logbooks.jlab.org/entry/3540466]. | ||
+ | #*Hall D BEM stopped reporting yesterday near 6pm [https://logbooks.jlab.org/entry/3540694] [AD] | ||
# Reports (some of these shown at the AWG yesterday): | # Reports (some of these shown at the AWG yesterday): | ||
#* Production vertex position [https://logbooks.jlab.org/entry/3540250 before/after collimator shift] (runs 40496 and 40509) [AA] | #* Production vertex position [https://logbooks.jlab.org/entry/3540250 before/after collimator shift] (runs 40496 and 40509) [AA] | ||
Line 20: | Line 21: | ||
# Planning: | # Planning: | ||
#* updated run time chart [https://halldweb1.jlab.org/wiki/index.php/File:Spring18_week8.jpg] | #* updated run time chart [https://halldweb1.jlab.org/wiki/index.php/File:Spring18_week8.jpg] | ||
+ | #* rumored new proposed plan (?) | ||
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]: | # Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]: | ||
#* Harp scan in early morning (?) | #* Harp scan in early morning (?) |
Revision as of 09:25, 1 March 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Thursday, March 1
- Notes from the previous 24 hours:
- Production Data with 58um JD70-100 diamond in the early afternoon
- At about 6pm, we started low intensity scan as proposed in Justin's google sheet
- For these runs: (i) Hovanes reverted the collimator position to the same value used in the previous current scan, (ii) We reverted to the previous value of the CDC window offset
- [Beam Position Strip Chart, AC, PS Coincidence Monitoring https://logbooks.jlab.org/entry/3540484] (small interruption from 9pm-10pm)
- Issues:
- Reports (some of these shown at the AWG yesterday):
- Production vertex position before/after collimator shift (runs 40496 and 40509) [AA]
- Pedestals Monitor FCAL, BCAL (run 41546 - production) [4] [SF]
- Beam Trip map updated in CCDB [5] [DL]
- Planning:
- updated run time chart [6]
- rumored new proposed plan (?)
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Harp scan in early morning (?)