Difference between revisions of "Run Planning Meeting Notes, Mar 1-Mar 7, 2018"

From GlueXWiki
Jump to: navigation, search
Line 20: Line 20:
 
#* Pedestals Monitor FCAL, BCAL (run 41546 - production) [https://logbooks.jlab.org/entry/3540258] [SF]
 
#* Pedestals Monitor FCAL, BCAL (run 41546 - production) [https://logbooks.jlab.org/entry/3540258] [SF]
 
#* Beam Trip map updated in CCDB [https://logbooks.jlab.org/entry/3540385] [DL]
 
#* Beam Trip map updated in CCDB [https://logbooks.jlab.org/entry/3540385] [DL]
 +
#* low level monitoring [https://logbooks.jlab.org/entry/3540689] [TB]
 
#* yesterday AWG meeting [https://halldweb.jlab.org/wiki-private/index.php/February_28,_2018,_Analysis_Working_Group#Minutes]
 
#* yesterday AWG meeting [https://halldweb.jlab.org/wiki-private/index.php/February_28,_2018,_Analysis_Working_Group#Minutes]
#* low level monitoring [https://logbooks.jlab.org/entry/3540689]
 
 
# Planning:
 
# Planning:
 
#* updated run time chart [https://halldweb1.jlab.org/wiki/index.php/File:Spring18_week8.jpg]
 
#* updated run time chart [https://halldweb1.jlab.org/wiki/index.php/File:Spring18_week8.jpg]

Revision as of 09:40, 1 March 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, March 1

  1. Notes from the previous 24 hours:
    • MCC reports
    • Production Data with 58um JD70-100 diamond in the early afternoon
    • At about 6pm, we started low intensity scan as proposed in Justin's google sheet
    • For these runs: (i) Hovanes reverted the collimator position to the same value used in the previous current scan, (ii) We reverted to the previous value of the CDC window offset
    • [Beam Position Strip Chart, AC, PS Coincidence Monitoring https://logbooks.jlab.org/entry/3540484] (small interruption from 9pm-10pm)
  2. Issues:
    • (fixed) Sean updated the CDC timing for the low intensity scan, see [1]. This has to be switched it back in production (see also this entry). How to restore production running (by Elton) [2].
    • Hall D BEM stopped reporting yesterday near 6pm [3] [AD]
  3. Reports (some of these shown at the AWG yesterday):
    • Production vertex position before/after collimator shift (runs 40496 and 40509) [AA]
    • Pedestals Monitor FCAL, BCAL (run 41546 - production) [4] [SF]
    • Beam Trip map updated in CCDB [5] [DL]
    • low level monitoring [6] [TB]
    • yesterday AWG meeting [7]
  4. Planning:
    • updated run time chart [8]
  5. Today's run plan (TBD) Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan in early morning (?)
    • ...