  1. Notes from the previous 24 hours:
    • Production Data with 58um JD70-100 diamond in the early afternoon
    • At about 6pm, we started low intensity scan see Justin's google sheet
    • For these runs: (i) Hovanes reverted the collimator position to the same value used in the previous current scan, (ii) We reverted to the previous value of the CDC window offset
  2. Issues:
    • (fixed) Sean updated the CDC timing for the low intensity scan, see [1]. This has to be switched it back in production (see also this entry). How to restore production running (by Elton) [2].
  3. Reports (some of these shown at the AWG yesterday):
  4. Planning:
    • updated run time chart [4]
  5. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan in early morning: ... [enter log entry here]
    • ... add itemized list of actions taken