(Thursday, Mar. 14 at 08:45)
Line 14: Line 14:
 
# Issues
 
# Issues
 
#* [https://logbooks.jlab.org/entry/3667383 RootSpy Problem with CCAL Pedestal Histograms]  
 
#* [https://logbooks.jlab.org/entry/3667383 RootSpy Problem with CCAL Pedestal Histograms]  
#* [https://logbooks.jlab.org/entry/3667375 Hall D y position variation fro Jay]
+
#* [https://logbooks.jlab.org/entry/3667375 Hall D y position variation from Jay. Beam position variation not related to dispersion.]
 +
#* [https://logbooks.jlab.org/entry/3667542 Console 1 frozen. Who knows how to reboot?]  
 
# Reports
 
# Reports
 +
#* [https://logbooks.jlab.org/entry/3667615 Rate monitoring] (Alexandre)
 
#* [https://logbooks.jlab.org/entry/3667347 FCAL shift in simulation] (Liping)
 
#* [https://logbooks.jlab.org/entry/3667347 FCAL shift in simulation] (Liping)
 +
#* [https://logbooks.jlab.org/entry/3667626 Beni really wanted to conitune our discussion yesterday on histogram binning] (Beni)
 
# Today:
 
# Today:
 
#* Production: 200nA, Al 10<sup>-4</sup>
 
#* Production: 200nA, Al 10<sup>-4</sup>
 
#Run Plan
 
#Run Plan
 
#* Production running  
 
#* Production running  
#* TAC run on Sunday when Hall C goes down. They will remain down until Tuesday. Hall A goes down Thursday.
+
#* Hall C goes down Sunday at 4pm. Postpone TAC run until Monday unless there are objections.
#*Empty target runs after TAC
+
#** There are parity quality beam testes (PQB) scheduled for Hall A Monday and Tuesday, but this should not affect the beam delivered to us.
#* Parity Quality Beam (PQB) tests scheduled for Monday and Tuesday. We will still get physics quality beam.
+
#* RF Recovery scheduled for Wednesday
#* RF Recovery Wednesday? Thursday?
+

Revision as of 08:24, 14 March 2019


Thursday, Mar. 14 at 08:45

  1. Past 24 hours:
    • Production running
  2. Issues
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running
    • Hall C goes down Sunday at 4pm. Postpone TAC run until Monday unless there are objections.
      • There are parity quality beam testes (PQB) scheduled for Hall A Monday and Tuesday, but this should not affect the beam delivered to us.
    • RF Recovery scheduled for Wednesday