(Friday, Mar. 15 at 08:45)
Line 22: Line 22:
 
##* [https://logbooks.jlab.org/entry/3667944 One base lost HV near beam line. Access needed? Need to discuss offline how to best HV failures near beamline.]
 
##* [https://logbooks.jlab.org/entry/3667944 One base lost HV near beam line. Access needed? Need to discuss offline how to best HV failures near beamline.]
 
# Reports
 
# Reports
#* []
+
#* [https://logbooks.jlab.org/entry/3667917 FCAL scalers since LHe target switchover (follow up from disconnected crates)]
 
# Today:
 
# Today:
 
#* Production: 200nA, Al 10<sup>-4</sup>
 
#* Production: 200nA, Al 10<sup>-4</sup>
 
#Run Plan
 
#Run Plan
 
#* Production running  
 
#* Production running  
#* TAC run  
+
#* TAC run
  
 
== Thursday, Mar. 14 at 08:45 ==
 
== Thursday, Mar. 14 at 08:45 ==

Revision as of 01:12, 15 March 2019


Friday, Mar. 15 at 08:45

  1. Past 24 hours:
    • Short access after meeting
    • gluon01 is back with a new kernel and graphics driver
    • Production running
  2. Issues
    • Problematic FCAL channels near beamline
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running
    • TAC run

Thursday, Mar. 14 at 08:45

  1. Past 24 hours:
    • Production running
  2. Issues
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running
    • Hall C goes down Sunday at 4pm. Postpone TAC run until Monday unless there are objections.
      • There are parity quality beam testes (PQB) scheduled for Hall A Monday and Tuesday, but this should not affect the beam delivered to us.
    • RF Recovery scheduled for Wednesday